My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 V & A Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 V & A Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2007 10:45:36 AM
Creation date
12/4/2007 10:45:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
A & A Consulting Engineers
PROJECT NAME
Consultants for Waste Water Flow Monitoring
Date
11/30/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~V&A <br /> <br />EXH1B1T~ <br /> <br />lake NerTitt Plaza <br />1999 Harrison St, Suite 9i5 <br />Oakland, CA 9-1612 <br /> <br />SIO.90H600 rei <br />510.903.6601 Fax <br />vaengineerlng.com <br /> <br />November 7, 2007 <br /> <br />Mr. Jimmy Tan, P.E. <br />Associate Civil Engineer <br />City of Redwood City <br />Engineering & Construction <br />Mailing Address: P.O. Box 391, Redwood City, CA 94064 <br />Delivery Address: 1017 Mlddlefield Road Redwood City, CA 94063 <br /> <br />SUBJECT: <br /> <br />Proposal for Wastewater Flow Monitoring Services, Annual Flow Monitoring Program <br /> <br />Dear Mr. Tan, <br /> <br />Thank you for this opportunity to submit a proposal for the Wastewater Flow Monitoring Services project <br />in the City of Redwood City. The information provided is true, accurate and represents the most current <br />information available as of the date of this proposal. <br /> <br />Project Approach: V&A is an engineering consulting firm that specializes in evaluating, rehabilitating, and <br />preserving municipal Infrastructure, Including Installing flow meters and conducting VI analysis. All flow <br />meters are Installed by engineers who understand the Intricacies of sanitary sewer practices and design and <br />can use professional judgment to address sanitary sewer flow conditions. The persons performing the <br />confined space entries, handling and installing the flow meters, care about quality and integrity of the data, <br />care about whether or not the velocity is optimal for meter data acquisition, and care how much of an offset <br />is required so as to prevent sedimentation build-up and potential loss of data. V&A's intention and <br />approach is to (a) provide the most accurate and most reliable data possible for open channel flow <br />monitoring, and (b) add value to the deliverables to the City, which will allow City engineers to make <br />necessary decisions quickly and with minimal extra and unnecessary work. <br /> <br />Project Personnel: The key project team members are listed as follows: <br /> <br />Key Project Team Members: <br /> <br />V&A Consulting Engineers <br />Jose Villalobos, P.E., Principal-in-Charge <br />Kevin Krajewski, P.E., Project Manager/Senior Project Engineer <br />Derek Wurst. P .E., Project Engineer <br /> <br />Principal Contact Person: <br /> <br />Kevin Krajewski, P.E., Sewer Services Division Manager <br />1999 Harrison Street, Suite 975, Oakland. CA 94612 <br />(510) 903-6600 (main) and (510) 903-6601 (fax) <br />kkraiewski@vaenaineerina.com <br /> <br />OAKLAND I HOUSTON <br /> <br />07-08'25 Redwood City ~JP 1'1117 Sit~~. 2111"llth$Rn~1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.