My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 226 <br /> (b) Certain Matters Covered bv�Pzecise Plan. The(1)permitted uses of the Property, <br /> (2) density, intensity, rate and tzming of development; (3) design, irnpxovement, and construction <br /> standards and specifications, with respect to height and size ofproposed buildings and other <br /> matters; and (4)provisions for reservation or dedication of land for public purposes for the <br /> Project, shall be those identified in the Precise Plan. <br /> (c) Dedi.cation Requir.ements, Exactions and Fees. During�11e Term,the City <br /> dedication require�nents, exactions and fees {each a"IVleasure"), including without limitation <br /> processing and inspection fees, development impact fees and measures to mitigate enviroi�ne��tai <br /> impacts mentioned in the EIR and E[R Addendum, applicable t�the Project shall be those in <br /> effect as of tlie Effective Date, modifed only by Measures which either are specifically <br /> identified in the Precise Plan or which apply, on a basis which does not discriminate against the <br /> Property or the Project,to at least three(3) other sites within the City, and either: (i) wl�ose effect <br /> is to applyr to tl�e Project an adjustment of the asnaunt or rr�agnitude of a fee or other exactiou <br /> existing on the Effecti.ve Date; or(ii)which mitigate an impaet af tlae Project that either was not <br /> identified in�he EIR or the Precise Plan, or was identi�ed but for which no mitigation measure <br /> was described or adopted; and further provided that credit is a�ailable to the"Developer, when <br /> appropriate, for public improvements completed or to be completed by the Developer at the <br /> Developer's expense(e.g., if Developer constructs or installs public improvements that serve a <br /> wider geographic area than the Property itsel�. <br /> (d} Timin�ofDevelopment. Developer shall have the right to develop the Project at <br /> such tin�e or times prior to the expiration of the Tertn as Developer deems appropriate within the <br /> exercise of its good faith business judgment,provided that the 1'roject is developed substantially <br /> in compIiance with aaiy timin.g provisions of the Precise Plan and the provisioiis of this <br /> Agreement. Since the Califarnia Supreme Court held that the failure of the parties in Pardee <br /> Cortstruction Co. v. City of Camarillo, 37 Cal.3d 465 (1984),to provide for the timing of <br /> development resulted in a later-adopted initiative restrieting the timuig of development and <br /> conirolling the parties' agreement, it is the express uztent of City and Developer that Develaper <br /> have the right to develop the Project at such rate and times prior to the expiration of the Term as <br /> Devcloper deems appropriate,provided that development is consistent with the express terms of <br /> this Agreement and fihe Precise Plan. City acknowledges th.a! such a right is consistent with the <br /> intent,purpose and understanding of the Parties to this Agreement, and that withaut such a righ±, <br /> Developer's development of the Project would be subject to the uncertainties sought to be <br /> avoided by th.e Government Code Section 65864 et seq. and this Agreement. Tl�e Parties <br /> acic..nowledge tl�at thi.s Agreement contains no requiren�ent that Developer must complete <br /> developinent of the Project or az�y pliase thereof, or development of the Property ar any portion <br /> thereof within the Term of this Agreement or within any particular time period, and tl�at this <br /> Agreement confers upon Developer tl�e right, but not the abligation to construct the Project in <br /> accardance with the Precisc Pla�� and this Agreement. <br /> (e} Initiative and Referendum. If durialg the Term any City Law, including without <br /> limitation az�y moratorium or oiher limita�io�1 (whether relating to the rate,tiining,phasing or <br /> sequenci�lg of development affecting subsequent maps,building permits or other entitlements to <br /> use that are approved or to be approved, issued flr granted within the City, or portions of th.e <br /> I025843-6 5 <br /> DF2AFT 12J12/07 3:00 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.