My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 251 <br /> INFRA.STRUCTL'RE AND FINAI�iCING PLAN <br /> PeninsuIa Park <br /> This Infrastnzcture a��d Financing Plan{this "Plan")dated as of , 20 <br /> (the effective date of the Ord'ulance adopting the Agreement(defned below) and hereafter, the <br /> "Effeetive Date") constitutes the Infrastructure and Financing Plan for the Project(the <br /> "Project"} descri.bed in that certain Developn�ent Agreement (the"Agreement"}dated as of the <br /> Effective Date and executed by and between R.C. Peninsula Park, LLC, a Delaware limited <br /> liability company("Developer") and the City of Redwood City, a inunicipal corporati.on of the <br /> Staie of Califarnia("City"). De�eloper and City are collectively referred ta herein as the <br /> "Parties." Capitalized terms used herein without defi�iiti.on shall have the�neaning ascribed to <br /> such tenns in ihe Agreement. <br /> l. Pu_rpose. <br /> This Plan identif es public improvements and infrastructure (collectively, the <br /> "Improvements")required to serve the Project and other property in the surrounding area, <br /> describes the phasi.ng for construction of such Improveinents relative to the developrnent of the <br /> Project, and describes potentia.l methads of financing such Improveinents th.rough a combination <br /> ofDeveloper co3�tributions, tax-exempt financing, state and federal assistai�ce, develop:�x�ent fees <br /> and other financing inechanisms, including possible advances of funds by Develaper, subject to <br /> reimbursement as set forth herein. <br /> 2. "Zone B" Improvements. <br /> Developer will be responsibte for the funding or tl�e construction and installation of tl�e <br /> Improvements listed in this Section 2 (the"Zone B Improvements") each as identified on the <br /> East 101 Public Infrastructure Plan attached hereta as Attachment 1 and as described in the East <br /> 101 Public Tnfrastructure Requirements schedule attached hereto as Attachment 2, and subject to <br /> partial reimbursement from other Zone B property owners based on the EDU allacation <br /> methodology set forth in.Attachments 1 �zd 2: <br /> B-SS3 Sanitary Sewer Line <br /> B-SS2 Sanitary Sewer Line <br /> B-SS 1 Sanitary Sewer Line <br /> B-RW1 Recycled Water Line <br /> B-Wl Potable Water Line <br /> B-W2 Pofiable Water Line <br /> 2.1 Phasin� for"Zone B" Im.prove�nez�ts. Developer will fiuld or construct the Zone <br /> B I�nproven:�ents in accoxdan.ce with the Conditions of Approval for the Project; suUject however, <br /> to the phasing schedule set f�rth in Attachment 3 which specifies the Zone B Ir�iprovements <br /> required for each phase of the Project. <br /> ]02G609-8 � <br /> 12-12-07 4;00 PM <br /> ]060930v4 3378b/001.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.