My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
US TA/NAB/L/TY GREEN <br /> � <br /> EATURES cont'd <br /> �������� <br /> . Provide secure bicycle storage of 5% of non-residential tenant, employees & visitors <br /> 4. Social gathering places <br /> a. Outdoor gathering places for residents <br /> b. Outdoor gathering places provide natural elements <br /> 5. Safety & natural surveillance <br /> a. All main entrances are prominent and visible from the street <br /> b. Residence entries have view to callers and can be seen by neighbors <br /> 6. Landscaping <br /> a. No plantings are listed on the invasive plant inventory by the California lnvasive <br /> Plant Council <br /> b. Specify drought-tolerant /California natives, Mediterranean or other appropriate <br /> species <br /> c. Create drought resistant soils <br /> d. Design and install high-efficiency irrigation system <br /> e. Minimize turn in landscape installed by builder <br /> i. Do not specify turf on slopes exceeding 10% or in areas less that 8 feet wide <br /> C. Site <br /> 1 . Construction and demolition waste management <br /> a. Divert a portion of all construction & demolition waste <br /> 2. Construction material efficiencies <br /> a. Components of the project are pre-assembled off-site & delivered to the project <br />
The URL can be used to link to this page
Your browser does not support the video tag.