My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14829
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2007
>
Res07 14829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2007 8:30:53 AM
Creation date
12/20/2007 8:24:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12/17/2007 <br /> <br />Practices (BMPs) for the control of point and non-point source pollutants in stormwater and <br />constitute the Stormwater Pollution Prevention Plan (SWPPP). Project grading shall not <br />commence (no grading permit shall be issued by the City) until an NPDES permit is issued, <br />demonstrating that project erosion control and stormwater treatment measures, including the <br />project SWPPP, meet SWRCB requirements. The project shall be required to fully implement <br />the erosion control and other water quality measures cited in the SWPPP and to monitor these <br />measures during a specified period following completion of project construction. The RWQCB <br />would be responsible for inspecting these measures, typically on an annual basis, while the <br />sponsor would be responsible for implementing any remedial measures if the Board indicated <br />that site stormwater quality objectives were not being met. The City Engineering Division would <br />also be responsible for post-construction inspection of all measures that would eventually <br />become part of the maintained infrastructure of the project, including source control and water <br />quality treatment measures. <br /> <br />Findings: Implementation of these measures would reduce the construction- <br />related soil erosion and sedimentation impacts to a less-than-significant level. <br /> <br />B. Increased Stormwater Contaminant Loadina - Potential Violation of Water <br />Qualitv Standards <br /> <br />Potential Impact 9-2: The proposed project would result in incremental <br />increases in the stormwater contaminant loading for some heavy metals, as well as oil and <br />grease and pesticide/herbicide residues. Project contaminant input could further impair the <br />already impaired quality of stormwater discharged to Redwood Creek, which has included (from <br />various sources in the area) copper, hydrocarbons, PCBs, and DDTs in excess of EPA <br />thresholds. This possible project effect is considered a potentially significant impact. <br /> <br />Mitigation 9-2: Apply the following site-appropriate Best Management Practices <br />(BMPs) or their equivalents as part of the project Stormwater Pollution Prevention Plan <br />(SWPPP), including measures required to comply with the C.3 regulations adopted as part of <br />the San Mateo Countywide Stormwater Pollution Prevention Program (STOPPP), in order to <br />comply with the requirements of the NPDES General Permit and imminent updating of the <br />Municipal Stormwater Permit for Redwood City: <br /> <br />1. Integrate start-at-the-source measures for stormwater control and treatment <br />into the project stormwater drainage design. Such measures could include <br />pervious parking lots, infiltration basins, vegetated (grass) swales <br />("bioswales"), or other measures designed to minimize stormwater runoff <br />(through maximization of local infiltration and detention storage), settle out <br />fine sediments, and filter contaminants. Oil/grease traps, sand filters, or <br />similar in-line filtration systems for storm drain systems should also be <br />considered. Such traps, filters, or separators must be accompanied by a <br />clean out/maintenance program that ensures acceptable trap efficiencies, <br />specifies appropriate disposal procedures, and reduces the risk that the traps <br />become sinks for pollutants. <br /> <br />2. Institute a regular schedule of street and parking lot sweeping. The frequency <br />of cleaning shall be higher (twice monthly) during the winter rainy season, yet <br />maintained year-round. Regular cleaning of paved surfaces reduce the "first <br />flush" phenomenon wherein the highest concentration of contaminants are <br />flushed off the surfaces during the early portion of a runoff event. Cleaning <br /> <br />Atty/Reso/Reso.1772 <br />121707 <br /> <br />24 <br /> <br />14829 <br />Muff# 613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.