Laserfiche WebLink
6.G. - Page 7 of 16 <br />SECTION 02662 RECYCLED WATER SYSTEMS <br />New Specification. <br />SECTION 02720 STORM DRAINAGE <br />PVC pipe criteria added, testing procedures updated, and <br />pipe marking requirements added. <br />SECTION 02730 SANITARY SEWERS <br />References updated, HDPE specifications added, submittal <br />requirements added, connections and other miscellaneous <br />requirements clarified, pipe abandonment specifications <br />added, and cleaning requirements added. <br />SECTION 02731 CLEANING OF PIPE <br />New Specification. <br />SECTION 02732 CLOSED CIRCUIT TV INSPECTION OF PIPE <br />Pipe cleaning requirements removed in -lieu of new <br />Specification Section 02731. <br />SECTION 02733 POINT REPAIR <br />References revised. Cleanup requirements added. <br />SECTION 02734 PIPE BURSTING <br />References revised. Warranty and certification requirements <br />updated for clarity. HDPE certification requirements added. <br />SECTION 02735 PRECAST CONCRETE MANHOLES <br />New Specification. <br />SECTION 02737 CURED IN PLACE PIPE (CIP) <br />References added and specifications moved to other <br />specification sections for clarity. Additional certification and <br />testing requirements added. <br />SECTION 02738 MANHOLE REHABILITATION <br />Submittal requirements added. <br />SECTION 02740 FLOW BYPASS SYSTEM <br />Posting of no parking signs in advance of the restriction date <br />changed from 24 hours to 48 hours. <br />SECTION 02750 REMOVAL AND DISPOSAL OF EXISTING MANHOLE <br />New Specification. <br />ATTY/RESO.0102/CC RESO APPROVING & ADOPTING REVISED ENGINEERING STANDARDS— EXHIBIT A <br />REV: 10-23-19 PR <br />Page 2 of 11 <br />203 <br />