My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-11-25 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-11-25 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 9:24:15 AM
Creation date
11/21/2019 4:36:25 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/25/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.G. - Page 9 of 16 <br />D -8A COMBINATION CATH BASIN/INLET <br />Notations updated to clarify construction requirements. <br />D-813 CURB AND GUTTER <br />Notations updated to clarify construction requirements. <br />E-3 STREET LIGHT (SINGLE) <br />Revised grammatical error. <br />E-4 STREET LIGHT FOOTING <br />Revised grammatical error. <br />M-1 STANDARD STREET MONUMENT (PLACEMENT AND CASTING) <br />Modified surveyor's note. <br />M-3 TYPE I MANHOLE (PIPES 6" T021") <br />Notations and call -outs updated to clarify construction requirements. <br />M-4 TYPE II MANHOLE (PIPES 24" TO 48") <br />Notations and call -outs updated to clarify construction requirements. <br />Additional reinforcement added to manholes. <br />M-5 TYPE III MANHOLE (PIPES LARGER THAN 48") <br />Sealant requirements updated. Manholes steps clarified. <br />M-6 MANHOLE FRAME AND COVER <br />Call -outs and notations updated to clarify construction requirements. <br />RW -1 HDPE RECYCLED WATER SERVICES <br />New Detail. <br />RW -2 HDPE 4" AND 6" RECYCLED WATER SERVICES <br />New Detail. <br />RW -5 HDPE 2" BLOW OFF <br />New Detail. <br />RW -6 HDPE COMBINATION AIR RELASE AND VACUUM VALVE <br />New Detail. <br />RW -8 HDPE 6" MID LINE BLOW OFF ASSEMBLY <br />New Detail. <br />RW -16 HDPE GATE AND BUTTERFLY VALVES JOINTS AND ADAPTERS <br />New Detail. <br />ATTY/RESO.0102/CC RESO APPROVING & ADOPTING REVISED ENGINEERING STANDARDS— EXHIBIT A <br />REV: 10-23-19 PR <br />Page 4 of 11 <br />205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.