Laserfiche WebLink
6.G. -Page 12 of 16 <br />New Detail. <br />W-4 PVC FIRE HYDRANT (BAY MUD) <br />Revised sewer lateral symbol and description. <br />W-4 HDPE FIRE HYDRANT (BAY MUD) <br />New Detail. <br />W-5 PVC 2" BLOW OFF <br />In-line valve added. Copper tubing removed. <br />W-5 HDPE 2" BLOW OFF <br />New Detail. <br />W-6 PVC COMBINATION AIR RELASE AND VACUUM VALVE <br />Isolation valve at base added. Slope criteria added. New corporation stop <br />assembly added. <br />W-6 HDPE COMBINATION AIR RELASE AND VACUUM VALVE <br />New Detail. <br />W-7 PVC WATER SAMPLING STATION <br />New Detail. <br />W-7 HDPE WATER SAMPLING STATION <br />New Detail. <br />W-10 PVC THRUST BLOCK <br />Valve tie down rods added. Valve block construction clarified. Engineering <br />design criteria table presented on detail to assist with project -by -project <br />design changes, when needed. <br />W-11 PVC THRUST BLOCK (BAY MUD) <br />Revised for clarity. <br />W-12 PVC VERTICAL BLOCK ANCHOR <br />Redundant tie -down straps added for increased safety. <br />W-13 PVC THRUST RESTRAINT LENGTH TABLE <br />Revised for clarity. <br />W-14 PVC RESTRAINTS FOR WATER MAIN LOWERING <br />Revised for clarity. <br />W-15 PVC RESTRAINED CONNECTIONS <br />New Detail. <br />ATTY/RESO.0102/CC RESO APPROVING & ADOPTING REVISED ENGINEERING STANDARDS— EXHIBIT A <br />REV: 10-23-19 PR <br />Page 7 of 11 <br />1: <br />