Laserfiche WebLink
6.G. -Page 15 of 16 <br />Z-21 EL CAMINO REAL STREET TREE PLANTING (SIDEWALK) <br />New detail. <br />VOLUME III — DESIGN CRITERIA <br />PART I GENERAL ENGINEERING PLAN REQUIREMENTS <br />Revised and modernized to reflect current industry practices. <br />PART II SURVEYING AND GRADING CRITERIA <br />Clarity added and updated to reflect current storm water requirements <br />PART V STORM DRAIN DESIGN CRITERIA <br />Revised with more precise engineering design approaches. <br />PART VI SANITARY SEWER SYSTEM DESIGN CRITERIA <br />Large lateral connections and manhole freeboard criteria added. Rainfall <br />induced sewer flow methods clarified. <br />PART VII WATER SYSTEM DESIGN CRITERIA <br />Fire flow requirements deferred to fire agencies having authority, and <br />other criteria clarified. <br />PART XII RECYCLED WATER SYSTEM DESIGN CRITERIA <br />New criteria. <br />PART XIII. ATTACHMENTS <br />Attachment C-11 SIDEWALKS REPAIR REQUIREMENTS (OMITTED) <br />Attachment D-1 RESIDENTIAL DRAINAGE GUIDELINES (NEW <br />ATTACHMENT TO DIFFERENTIATE FROM <br />COMMERCIAL) <br />Attachment D-2 COMMERCIAL DRAINAGE GUIDELINES (NEW <br />ATTACHMENT TO DIFFERENTIATE FROM <br />RESIDENTIAL) <br />Attachment E-1 PARKING DIMENSIONS (NEW ATTACHMENT) <br />Attachment G SOIL RESISTIVITY AND ANNODE SIZING <br />ATTACHMENT G IN CURRENT 2014 STANDARDS, <br />TITLED "RAINFALL (I.D.F.) CURVES", WHICH IS <br />USED AS STORM DRAIN DESIGN CRITERIA, IS <br />REMOVED AND MORE ACCURATE STORM DRAIN <br />ATTY/RESO.0102/CC RESO APPROVING & ADOPTING REVISED ENGINEERING STANDARDS— EXHIBIT A <br />REV: 10-23-19 PR <br />Page 10 of 11 <br />211 <br />