My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2471
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2019
>
Ord 2471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:34:15 PM
Creation date
12/3/2019 12:34:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
11/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/25/2019 <br />SECTION 6. This Ordinance shall go into effect thirty (30) days after the date of its <br />passage and adoption. <br />EXHIBIT A <br />AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDWOOD <br />CITY ADDING A NEW ARTICLE XIII TO CHAPTER 9 OF THE REDWOOD <br />CITY MUNICIPAL REGARDING EXPEDITED PERMIT PROCESSING <br />FOR ELECTRICAL VEHICLE CHARGING STATIONS <br />Sec. 9.217. - Definitions: <br />A. "Electric vehicle charging station" or "charging station" means any level of electric <br />vehicle supply equipment station that is designed and built in compliance with <br />Article 625 of the California Electrical Code as it reads on the effective date of this <br />section, and delivers electricity from a source outside an electric vehicle into a <br />plug -in electric vehicle. <br />B. "Electronic submittal" means the utilization of one or more of the following: <br />1. Email; <br />2. The Internet; or <br />3. Facsimile. <br />C. "Specific, adverse impact' means a significant, quantifiable, direct, and <br />unavoidable impact, based on objective, identified, and written public health or <br />safety standards, policies, or conditions as they existed on the date the <br />application was deemed complete. <br />D. "A feasible method to satisfactorily mitigate or avoid the specific adverse impact' <br />includes, but is not limited to, any cost - effective method, condition, or mitigation <br />imposed by the City on another similarly situated application in a prior successful <br />application for a permit. <br />Sec. 9.218. - Electric Vehicle Charging Station Requirements: <br />A. All electric vehicle charging <br />stations <br />shall meet <br />applicable health and safety <br />standards <br />and <br />requirements <br />imposed <br />by state and <br />local permitting authorities. <br />B. Electric vehicle charging stations shall meet all applicable safety and <br />performance standards established by the California Electrical Code, the Society <br />of Automotive Engineers, the National Electrical Manufacturers Association, and <br />accredited testing laboratories such as Underwriters Laboratories and, where <br />applicable, rules of the Public Utilities Commission regarding safety and <br />reliability. <br />Sec. 9.219. - Application Standards: <br />A. The Building Official or their designee shall implement an expedited permitting <br />ATTY /ORD.502 /CC ORDINANCE <br />REGARDING ELECTRICAL VEHICLE CHARGING STATIONS <br />ORDINANCE NO. <br />2471 <br />REV: 11 -19 -19 RL <br />MUFF NO. <br />305 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.