Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />Based on the proposal dated August 28, 2019, the Consultant will perform geotechnical <br />testing and observation, special inspections, and engineering services to support the <br />construction of the Red Morton Park - Magical Bridge Playground project in Redwood <br />City, California. <br />Based on discussion with the project general contractor, Bothman Construction <br />("Bothman"), remaining construction will extend until February 2020, weather permitting. <br />Consultant testing and observation services are required to confirm Bothman's work is <br />performed in conformance with project specifications. The remaining construction support <br />services include the following: <br />" Reinforcing steel inspections of remaining footings, piers, and stem walls. <br />• Concrete pour observations, samples preparation, transportation and laboratory testing of <br />remaining footings and stem walls. <br />" Foundation footing subgrade compaction testing and observation. <br />• Wall backfill compaction testing and observation. <br />• Grading compaction testing and observation. <br />" Utility trench backfill testing and observation. <br />" Preparation of final conformance report summarizing our testing and observation for the <br />project. <br />The above -listed services will require various site visits. Consultant's visits will occur as <br />summarized in Table 1. <br />TABLE 1: Scope of work <br />Task <br />Quantity <br />Structural Wall Reinforcing Steel Inspection <br />3 field visits <br />Structural Wall Concrete Pours <br />3 field visits <br />Laboratory Concrete Sample Preparation, <br />Transportation and Compressive Strength Testing <br />3 sets of tests <br />Site Grading and Backfill Compaction Testing <br />50 Feld visits <br />LaboratorySoil Testing2 <br />sam les <br />Final Reocrt <br />1 report <br />The work is based on a time -and -materials basis in accordance with the Fee Schedule <br />and Equipment and Materials Charges below. The fee table provided below corresponds <br />to the tasks listed in Table 1. The tasks will occur during regular business hours. Weekend <br />and overtime work is not anticipated. <br />TABLE 2: Fee Table <br />Tasks I Not -to -Exceed Amount <br />REV: 11-19-19 RL <br />ATTY/AGR.2019.276/ENGEO (Page 11 of 13) <br />