My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.C. - Page 29 of 178 <br />The project, with the implementation of mitigation measure MMN0I-1.2, would reduce noise impacts from mechanical <br />equipment at nearby sensitive receptors by requiring the equipment type, design, and/or location be as such to meet <br />ambient noise conditions at nearby residences. For this reason, the project's mechanical equipment would not result <br />in a significant impact. The facts in support of this finding are further described on pages 118 through 119 of the Draft <br />EIR. <br />MM N0I-1.1 The project shall develop a construction noise control plan, which shall include, but is not limited to, <br />the following measures: <br />• If residents surrounding the project site complain about weekend and/or holiday construction noise or if work <br />is disruptive to the adjacent Red Morton Community Park activities occurring on Saturdays, all weekend and <br />holiday construction work shall cease at the City's discretion, as specified in the allowable construction hours <br />stated in the City's Municipal Code. <br />• Construct temporary noise barriers shall be installed, where feasible to screen stationary noise -generating <br />equipment when located within 200 feet of adjoining sensitive land uses. Temporary noise barrier fences would <br />provide a five dBA noise reduction if the noise barrier interrupts the line -of -sight between the noise source and <br />receptor and if the barrier is constructed in a manner that eliminates any cracks or gaps. <br />• If stationary noise -generating equipment is located near receptors, adequate muffling (with enclosures where <br />feasible and appropriate) shall be used. Any enclosure openings or venting shall face away from sensitive <br />receptors. <br />• Construction staging areas (including material stockpiles, maintenance/equipment staging, and parking areas) <br />shall be established at locations that would create the greatest distance between the construction -related noise <br />sources and noise -sensitive residential receptors nearest the project site during all project construction. <br />• Generators, compressors, and pumps shall be housed in acoustical enclosures. <br />• Where feasible, temporary power service from local utility companies should be used instead of portable <br />generators. <br />• Locate cranes as far from adjoining noise -sensitive residential receptors as possible. <br />• During final grading, substitute graders for bulldozers. Wheeled heavy equipment are quieter than track <br />equipment. <br />• Substitute nail guns for manual hammering. <br />• Avoid the use of circular saws, miter/chop saws, and radial arm saws near the adjoining noise -sensitive <br />residential receptors. Shield saws with a solid screen with material having a minimum surface density of two <br />pounds per square feet (e.g., such as 3/4 -inch plywood). <br />• Substitute electrically -powered tools for noisier pneumatic tools. <br />• Maintain smooth vehicle pathways for trucks and equipment accessing the site, and avoid local residential <br />neighborhoods as much as possible. <br />• During interior construction, the exterior windows facing noise -sensitive receptors shall be closed. <br />• During interior construction, noise -generating equipment shall be located within the building to break the line - <br />of -sight to the adjoining receptors. <br />• The contractor shall be required to prepare a schedule for major noise -generating construction activities. The <br />construction plan shall identify a procedure for coordination with adjacent residential land uses so that <br />construction activities can be scheduled to minimize noise disturbance. <br />• Designate a "disturbance coordinator" who would be responsible for responding to any complaints about <br />construction noise. The disturbance coordinator would determine the cause of the noise complaint (e.g., bad <br />muffler, etc.) and would require that reasonable measures be implemented to correct the problem. <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 12 of 44 <br />452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.