Laserfiche WebLink
7.C. - Page 35 of 178 <br />facility and have provided comments on what the materials that should be included in the display from the historic <br />resource. However, as the historic resource would be demolished, the impact is considered significant and <br />unavoidable. <br />See MM CUL -1.1 and MM CUL -1.2 above <br />SECTION IV: FINDINGS REGARDING SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL <br />CHANGES. <br />Sections 15126(c) and 15126.2(c) of the CEQA Guidelines require that an EIR address any significant <br />irreversible environmental changes that would occur should the project be implemented. Generally, a project would <br />result in significant irreversible environmental changes if any of the following would occur: <br />• The project would involve a large commitment of non-renewable resources; <br />• The primary and secondary impacts of the project would generally commit future generations to similar <br />uses; <br />• The project involves uses in which irreversible damage could result from any potential environmental <br />accidents; or <br />• The proposed consumption of resources is not justified. <br />During construction and operation, the project would require the use and consumption of nonrenewable resources. <br />Unlike renewable resources, nonrenewable resources cannot be regenerated over time. Nonrenewable resources <br />include fossil fuels and metals. Renewable resources, such as lumber and other wood byproducts, could also be used. <br />Energy, as discussed in more detail in Section 3.6 of the Draft EIR, would be consumed during both the construction <br />and operational phases of the project. The construction phase would require the use of nonrenewable construction <br />material, such as concrete, metals, and plastics, and glass. Nonrenewable resources and energy would also be consumed <br />during the manufacturing and transportation of building materials, preparation of the site, and construction of the <br />buildings. The operational phase would consume energy for multiple purposes including building heating and cooling, <br />lighting, appliances, and electronics. Energy, in the form of fossil fuels, would be used to fuel vehicles traveling to <br />and from the project site. <br />The project would result in a substantial increase in demand for nonrenewable resources. The project, however, is <br />subject to the standard California Code of Regulations Title 24 Part 6 and CALGreen energy efficiency requirements. <br />In addition, as described in Section 2.0, the project would meet a minimum LEED Certification standards. For these <br />reasons, the project would minimize the use of nonrenewable energy resources. <br />The project would be developed on a site that is already fully developed for urban uses. Development of the project <br />would commit resources to prepare the site, construct the buildings, and operate them, but it would not result in <br />development of a previously undeveloped area. <br />The project does not propose any new or uniquely hazardous uses and, consistent with current operation of the VMSC <br />and YMCA, its operation would not cause environmental accidents that would impact other areas. As discussed in <br />Section 3.9 Hazards and Hazardous Materials of the Draft EIR, there would be no significant hazards and hazardous <br />materials conditions on-site or off-site that would substantially affect the public and surrounding environment. There <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 18 of 44 <br />