Laserfiche WebLink
7.C. - Page 45 of 178 <br />Mitigation Monitoring or Reporting Program <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />Timeframe for <br />Responsibility <br />Oversight of <br />Impacts <br />Mitigation <br />Implementation <br />for <br />mplementation <br />Implementation <br />Air Quality <br />Impact AIR -3: The <br />MM AIR -3.1: Prior to issuance of a grading permit, the project <br />Prior to issuance <br />Project applicant <br />City Planning <br />project would not <br />shall develop a plan demonstrating that the off-road equipment <br />of a grading <br />and contractors <br />Division <br />expose sensitive <br />used on-site to construct the project would achieve a fleet -wide <br />permit <br />receptors to substantial <br />average 55 -percent reduction in DPM exhaust emissions or <br />pollutant concentrations <br />greater. The plan shall be submitted and approved by the City <br />with mitigation <br />Planning Division. The following are feasible methods: <br />incorporated. <br />• All diesel -powered off-road equipment, larger than 25 <br />Less than Significant <br />horsepower, operating on the site for more than two days <br />Impact with Mitigation <br />continuously shall, at a minimum, meet EPA particulate <br />Incorporated <br />matter emissions standards for Tier 3 engines with CARB- <br />certified Level 3 Diesel Particulate Filters or equivalent. <br />• All diesel -powered off-road equipment, larger than 25 <br />horsepower, operating on the site for more than two days <br />continuously shall meet EPA Tier 4 standards for <br />particulate matter. <br />• The use of equipment that includes electric or <br />alternatively -fueled equipment (i.e., non -diesel) would <br />meet the reduction requirement above. <br />Implementation of MM AIR -3.1 would result in a less than <br />significant impact with respect to community risk caused by <br />construction activities. The computed maximum increased lifetime <br />residential cancer risk from construction would be 3.5 in one <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 28 of 44 468 <br />