My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.C. - Page 57 of 178 <br />Mitigation Monitoring or Reporting Program <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />Timeframe for <br />Responsibility <br />Oversight of <br />Impacts <br />Mitigation <br />Implementation <br />for <br />mplementation <br />Implementation <br />Recreation <br />Impact REC-2: The <br />See MM CUL -1.1 and MM CUL -1.2 above <br />Same as MM <br />Same as MM <br />Same as MM <br />project would include <br />CUL -1.1 and <br />CUL -1.1 and <br />CUL -1.1 and <br />recreational facilities or <br />MM CUL -1.2 <br />MM CUL -1.2 <br />MM CUL -1.2 <br />require the construction <br />above <br />above <br />above <br />or expansion of <br />recreational facilities, <br />which may have an <br />adverse physical effect <br />on the environment, <br />even with mitigation <br />incorporated. <br />Significant and <br />Unavoidable Impact <br />with Mitigation <br />Incorporated <br />Transportation/Traffic <br />Impact TRN-1: The <br />MM TRN-1.1: 1. Within one year of full buildout and occupancy <br />Within one year <br />City of Redwood <br />Director of <br />project would not <br />of the project, the City shall complete a traffic operations study to <br />of full buildout <br />City <br />Community <br />conflict with a program <br />monitor Intersection 9, Valota Road and Roosevelt Avenue, and <br />and occupancy of <br />Development <br />plan, ordinance or policy <br />the project proponents shall signalize the intersection if the peak <br />the project <br />addressing the <br />hour traffic signal warrant is met and the level of service <br />circulation system, <br />deteriorates to an unacceptable level of service. <br />including transit, <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 40 of 44 480 <br />
The URL can be used to link to this page
Your browser does not support the video tag.