My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.C. - Page 60 of 178 <br />Conditions of Approval <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />• Having a certified arborist conduct necessary pruning and maintenance of trees prior to construction, <br />• Irrigating preserved trees appropriately pre- and post -construction. <br />Cultural Resource <br />• The project is required to prepare a cultural resources plan pursuant to the City's Cultural Resources Management Plan prior to demolition and <br />ground disturbing activities. Per the City's Cultural Resources Management Plan, the project's plan would include a summary of background <br />information on the project site, description of the historic resource, analysis of impacts, and measures to reduce impacts to cultural resources. <br />• General Plan EIR Mitigation Measure 4.5-3b: Prior to the issuance of grading permits, the project applicant is required to ensure all construction <br />crews undergo a training session to inform them of the presence and nature of federal or state -eligible cultural resources and the potential for <br />previously undiscovered human remains within the project area, of the laws protecting these resources and associated penalties, and of the <br />procedures to follow should they discover cultural resources during project -related work. <br />• General Plan EIR Mitigation Measure 4.5-3a: If human remains are encountered during ground disturbing activities, the project contractor and/or <br />on-site supervisor shall stop work within 50 feet of the discovery. The project contractor shall immediately notify the Coroner upon the discovery <br />of any human remains. At the same time, a qualified archaeologist, in coordination with the City Planning, Housing, and Economic Development <br />Department, shall assess the situation and consult with the appropriate agencies. If the human remains are of Native American origin, the Coroner <br />shall notify the NAHC within 24 hours of this identification. The NAHC will identify a Most Likely Descendant (MLD) to inspect the site and <br />provide recommendations for the proper treatment or disposition, with proper dignity, of the remains and any associated grave goods. Upon <br />completion of the assessment, the qualified archaeologist shall prepare a report documenting the background to the finds, and provide <br />recommendations for the treatment of the human remains and any associated cultural materials, as appropriate and in coordination with the <br />recommendations of the MLD. The report shall be submitted to the project applicant, the City Planning Department, and the NWIC. Once the <br />report is reviewed and approved by the City Planning Department, and any appropriate treatment completed, project construction activity within the <br />area of the find may resume. If the MLD does not make recommendations within 48 hours, the project applicant(s) shall reinter the remains in an <br />area of the property secure from further disturbance. If the project applicant(s) does not accept the MLD's recommendations, the applicant(s) or the <br />MLD may request mediation by the NAHC.1 <br />Hazardous Materials <br />• A visual inspection/pre-demolition survey, and possible sampling, shall be conducted prior to the demolition of on-site buildings to determine the <br />presence of asbestos -containing materials and/or lead-based paint. <br />'Redwood City. A New General Plan for Redwood City Draft Environmental Impact Report. May 2010. Certified October 2010. Page 4.5-26. <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 43 of 44 483 <br />
The URL can be used to link to this page
Your browser does not support the video tag.