My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />Page 24 <br /> <br />even in the event of a very high response rate. <br /> <br />Circle Point will also prepare one camera-ready hard copy version of the survey that could be <br />distributed at meetings and events and formatted as a self-mailer. CirclePointassumes that City <br />staff wouldarrange for survey printing, as well gather and input the hard copy survey results into <br />the online system, so that both hard-copy and on-line surveys would be tabulated together. <br /> <br />Circle Point will develop, compile the results, and summarize one survey during the course of the <br />New General Plan process. <br /> <br />As an optional task, CirclePoint has included the cost of a second survey. <br /> <br />3.9 Media Relations Support <br /> <br />Circle Point will coordinate with the City's PIO and confirm the City'S preferred means of informin9 <br />and interacting with the press. At a minimum, CirclePoint could provide counsel and input on <br />recommended messages and opportunities to encourage positive coverage. CirclePoint's scope <br />assumes help in preparing up to four press releases at milestone points, as well as graphic <br />design time to prepare up to two print ads that can be deployed at key milestones. We assume <br />the City would cover the cost of placement of these ads in appropriate local media. <br /> <br />Products: <br />Task 3.1 <br />. Key messages <br />· Public Participation Schedule <br />· Calendar of scheduled meetings <br /> <br />Task 3.2. <br />· Additions/refinements to affinity group list <br />· Review/assistance with contact database <br /> <br />Task 3.3 <br />· Regular tracking reports, monthly status reports, ongoing calls and meetings with City <br />staff <br />· Documentation of key coordination meetings and discussions <br /> <br />Task 3.4 <br />· Facilitation/summarization of 15 affinity group meetings <br />· Training & "roadshow presentation" for affinity group meeting presenters and facilitators <br /> <br />Task 3.5 <br />· Workshop treatments, agenda, posters, comment cards/stations, presentation, and <br />summary of public input <br />· Assistance/consultation to staff on logistical arrangements for meetings <br /> <br />Tasks 3.6 and 3.7 <br />· Draft and camera-ready copy of fact sheet and newsletters/updates including one update <br />into the gazette <br />· Printing specifications for all materials <br />· Translation of fact sheets and e-notices into Spanish. <br /> <br />SCOPE OF SERVICES <br />Redwood City General Plan <br />January 11, 2008 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.