My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />· Reflect Redwood City's diversity; <br />. Enjoy broad community support; <br /> <br />7A <br />Page 3 <br /> <br />Budget <br />The consultant team's budget for the new General Plan is $1 ,276,230. In addition to this <br />contract .amount, a 15% contingency of $191 ,435 is proposed. The contingency would <br />be used only if absolutely necessary to respond to unantiCipated challenges in a time- <br />effiCient manner to maintain work quality and schedule. Staff is requesting that the City <br />Council grant the City Manager or his designee the authority to utilize the contingency <br />fund as needed to complete the project. <br /> <br />The above expenses do not include another recommended planning effort: the <br />development ofa City-wide Traffic Model. Although a Traffic Model is not technically <br />required for the New General Plan,such models have been found to be important <br />analytical tools, providing more consistency in the consideration of the long-term effects <br />of various land use choices on traffic segments and intersections. Staff believes that <br />absent the New General Plan, the City would likely consider establishing a City-wide <br />Traffic Model to keep abreast of best practices with respect to transportation planning. <br />Venturing to do so now at the onset of the New General Plan effort provides some <br />advantages. For example, the Traffic Model can be used to comprehensively evaluate <br />different land use alternatives in the Environmental Impact Report for the New General <br />Plan. Also, development of the Traffic Model includes a number of background efforts <br />that will be undertaken for the Traffic Impact Fee Update, which is currently pending. <br />Thus, the present time offers an opportunity for efficient use of resources that can result <br />in cost savings. It should be noted that a comprehensive Traffic Model will not eliminate <br />the need to conduct traffic studies for individual development proposals. However, the <br />Traffic Model will be of value in those cases because it will establish a higher level of <br />consistency in the long-term analysis of each stand-alone traffic. study and will also be <br />coordinated with the C/CAG Model. <br /> <br />Both the Traffic Model and Impact Fee Update can be completed under separate <br />contracts and paid tor by Capital Improvement Funds which have already been <br />allocated. In the case of the Traffic Impact Fee Update, Council previously allocated <br />$74,000 in FY 2006-2007. The update has not yet been initiated, and the funds remain <br />available for this task. Staff and the traffic consultant are finalizing the scope of work for <br />the Traffic Model which, at this time, is expected to take six months and cost <br />approximately $200,000. It is possible that as significant development proposals are <br />submitted to the City in the near future, there may be'an opportunity to utilize relevant <br />new traffic system information to augment the City's work, potentially resulting in time <br />and cost savings in the development of the Traffic Model, to the extent that it is <br />appropriate. Approximately $300,000 remains in the Capital Improvement Program <br />(CIP) budget for the General Plan. These funds cOl::lld be used to cover the cost of the <br />Traffic Model and as soon as the agreement is in place tOL Council's consideration, staff <br />will request that this fund be encumbered for the Traffic Model. <br /> <br />The total consultant cost for the New General Plan (assuming use of the entire <br />contingency), the EIR, and development of a City-wide Traffic Model, is approximately <br />$1,667,665. The Traffic Fee Study Update is not considered a part of the General Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.