My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 22 of 44 <br />Contractor will furnish all labor, materials, and equipment necessary to provide on-call Supervisory <br />Control and Data Acquisition (SCADA) system maintenance and integration services to the Public Works <br />Services Department. <br />The City owns and operates approximately 70 facilities including sewer lift stations; storm water pump <br />stations; potable water pump stations, storage and regulating stations; and a recycled water pump <br />station. These facilities are monitored with a SCADA system consisting of Allen Bradley Programmable <br />Logic Controllers (PLCs), Wonderware Human Machine Interface (HMI) software, and various motor <br />control and instrumentation systems. Communications to remote facilities is provided by a <br />combination of wired circuits and wireless radio. <br />PWS is looking for a contractor with the following minimum skills to provide on- call maintenance and <br />troubleshooting services for the entire SCADA system: <br />■ Detailed knowledge of Allen Bradley DF1, DH+ and Modbus protocols; <br />■ Multi -vendor HMI support; <br />■ Experienced with SQL server; <br />■ Experienced with Wonderware platform; <br />■ Experienced with the Windows platform; <br />■ Experienced with Allen Bradley PLCs; <br />■ Proficient with radio (UHF, VHS, and spread spectrum) communication and protocol <br />■ Knowledge of industry best practices; <br />■ Knowledge of advanced digital network infrastructure; <br />PWS also requires the following from contractor: <br />■ Must have a valid California C-10 Electrical Contractor License <br />■ Must have a local office with trained support/engineering staff of five or more employees <br />located within 60 miles of Redwood City <br />■ Must be a Rockwell Recognized System Integrator <br />■ Must be a Wonderware Certified System Integrator Partner <br />■ Must have a current State of California DIR Registration number <br />■ Must have a minimum of two ISA Certified Controls Systems Technicians on staff <br />PWS will make available to the selected contractor the City's SCADA system documentation. PWS staff <br />will also be available to provide contractor site access, staff support and assistance as required. <br />1. On -Call Availability <br />Contractor must be available to respond to any emergency maintenance or troubleshooting needs <br />on a 24/ 7 basis. This includes weekends and holidays. In Item #7 (Work Plan), please describe your <br />typical response time for emergency calls. If response times vary based on after hours or weekends, <br />please specify. <br />PUBLIC WORKS SERVICES DEPARTMENT <br />FY 2019-20 ON-CALL SCADA SYSTEM MAINTENANCE AND TROUBLESHOOTING <br />NIB 5 OF 23 <br />183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.