My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 27 of 285 <br />1. ALMS may be installed to decrease electrical service and transformer costs <br />associated with EV Charging Equipment subject to review of the City. <br />2. Installation of Level 2 EV Ready +tsSpaces above the minimum <br />number required level may offset the minimum number Level 1 EV Ready <br />SiFGU+tsSFLevel s required on a 1:1 basis. <br />3. The requirements apply to multifamily buildings with parking spaces <br />including: a) assigned or leased to individual dwelling units, and b) <br />unassigned residential parking. <br />4. If a building permi�nplieant provides dG .�FF}eRtatien detailing that the <br />0RGreased—nost of Utility SerVFee_nr�ne trencfnrmeeF GapaGity�i �n�vaia <br />eXGeed-an average of $4,500 arnong parcigspaces with Level 2 E V Ready <br />C+rGUi+s and Level 1 EV Re jr���GGsts ore found to eXGeed this <br />Tcsurrcr- a.�--r��c" Ready ! " � arra-c��nccccr-crrro <br />level, thhe aappl>reantshall provide EV infrastrU ire up to a level that would <br />not evneed this nost for utility serviGe or on-site transformer nanaGity. <br />-5-4. In order to adhere to accessibility requirements in accordance with <br />California Building Code Chapters 11A and/or 11 B, it is recommended that <br />all accessible parking spaces for covered newly constructed multifamily <br />dwellings are provided with Level 1 or Level 2 EV Ready GirGUFtsSpaces. <br />4.106.4.2.1 Electric vehicle charging space (EV space) locations. Construction <br />documents shall indicate the location of proposed EV spaces. Where <br />common use parking is provided at least one EV space shall be located in <br />the common use parking area and shall be available for use by all residents. <br />Sec. 9.236. - SECTION 4.106.4.2.2 OF THE GREEN BUILDING STANDARDS CODE <br />AMENDED: <br />Section 4.106.4.2.2 of the Green Building Standards Code is amended to read as follows: <br />4.106.4.2.2 Electric vehicle charging space (EV space) dimensions. EV <br />spaces shall be designed to comply with Redwood City Zoning Ordinance <br />Section 30.6.A. <br />Sec. 9.237. - SECTION 5.106.5.3 OF THE GREEN BUILDING STANDARDS CODE <br />AMENDED: <br />Section 5.106.5.3 of the Green Building Standards Code is amended to read as follows: <br />5.106.5.3 Electric vehicle (EV) charging. [N] New construction shall comply with <br />Section 5.106.5.3.1 or Section 5.106.5.3.2 to facilitate future installation and use <br />of EV chargers. <br />EXCEPTION: Where there is no commercial power supply. <br />5.106.5.3.1 Office buildings: In nonresidential new construction buildings <br />designated primarily for office use with parking: <br />A. When 10 or more parking spaces are constructed, 10% of the available <br />parking spaces on site shall be equipped with Level 2 EVCS; <br />ATTY/ORD.504/CC ORDINANCE ADDING CALIFORNIA ENERGY CODE & GREEN BUILDING STANDARDS <br />REV: 12-20-19 RL <br />Page 15 of 18 <br />279 <br />
The URL can be used to link to this page
Your browser does not support the video tag.