Laserfiche WebLink
7.A. - Page 152 of 285 <br />2019 Energy Efficiency Ordinance Cost-effectiveness Study <br />Table 66: Multifamily Climate Zone 9 Results Summary (Per Dwelling Unit) <br />Climate Zone 9 <br />CO2 -Equivalent <br />NPV of <br />Benefit to Cost <br />SCE/SoCalGas <br />Annual <br />PV Size <br />Emissions (lbs/sf) <br />Lifetime <br />Ratio (B/C) <br />Net <br />Annual <br />EDR <br />Change <br />Incremental <br />Multifamily <br />kWh <br />therms <br />Margin <br />(kW)5 <br />Total <br />Reduction <br />Cost $ <br />On -Bill <br />TDV <br />Code Compliant <br />0 <br />111 <br />n/a <br />n/a <br />2.24 <br />n/a <br />I n/a <br />n/a <br />n/a <br />d <br />UL <br />Efficiency -Non -Preempted <br />(0) <br />109 <br />1.5 <br />(0.03) <br />2.19 <br />0.05 <br />I $136 <br />1.46 <br />3.35 <br />Q <br />Efficiency -Equipment <br />(0) <br />101 <br />2.5 <br />(0.03) <br />2.08 <br />0.16 <br />$274 <br />1.66 <br />2.87 <br />Efficiency & PV/Battery <br />(7) <br />109 <br />9.5 <br />0.03 <br />1.84 <br />0.40 <br />$2,234 <br />0.90 <br />1.49 <br />Code Compliant <br />1,468 <br />0 <br />n/a <br />n/a <br />1.33 <br />n/a <br />n/a <br />n/a <br />n/a <br />2 <br />Efficiency -Non -Preempted <br />1,414 <br />0 <br />1.5 <br />0.00 <br />1.30 <br />0.03 <br />$231 <br />1.29 <br />2.70 <br />d <br />Efficiency -Equipment <br />1,334 <br />0 <br />1.5 <br />0.00 <br />1.25 <br />0.08 <br />$361 <br />1.63 <br />1.58 <br />LU <br />Q <br />Efficiency & PV <br />441 <br />0 <br />11.0 <br />0.60 <br />1.04 <br />0.29 <br />$2,232 <br />1.34 <br />1.91 <br />Efficiency & PV/Battery <br />(7) <br />0 <br />23.0 <br />0.92 <br />0.58 <br />0.75 <br />I $5,236 <br />1.28 <br />1.67 <br />0 <br />Code Compliant <br />1,468 <br />0 <br />0.0 <br />0.00 <br />1.33 <br />0.91 <br />I ($2,337) <br />4.38 <br />2.55 <br />u <br />Efficiency & PV <br />55 <br />0 <br />11.0 <br />0.60 <br />1.04 <br />1.20 <br />($104) <br />>1 <br />>1 <br />Lu <br />L M Q <br />I Neutral Cost <br />I 331 <br />I 0 <br />I 11.0 <br />I 0.70 <br />1.03 <br />1.21 <br />$0 <br />>1 <br />>1 <br />'All reductions and incremental costs relative to the mixed fuel code compliant home. <br />2All reductions and incremental costs relative to the all -electric code compliant home. <br />3All reductions and incremental costs relative to the mixed fuel code compliant home except the EDR Margins are relative to the Standard Design for each case <br />which is the all -electric code compliant home. Incremental costs for these packages reflect the cots used in the On -Bill cost effectiveness methodology. Costs <br />differ for the TDV methodology due to differences in the site gas infrastructure costs (see Section 2.6). <br />4This represents the Efficiency EDR Margin for the Efficiency -Non -Preempted and Efficiency -Equipment packages and Total EDR Margin for the Efficiency & <br />PV, Efficiency & PV/Battery, and Neutral Cost packages. <br />5Positive values indicate an increase in PV capacity relative to the Standard Design. <br />2019-08-01 <br />Kin, <br />