Laserfiche WebLink
7.A. - Page 219 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 32. Cost Effectiveness for Small Hotel Package 1B - Mixed -Fuel + EE + PV + B <br />CZ <br />Utility <br />Elec <br />Savings <br />(kWh) <br />Gas <br />Savings <br />(therms) <br />GHG <br />Reductions <br />(mtons) <br />Comp- <br />liance <br />Margin <br />Incremental <br />Package Cost <br />Lifecycle <br />Utility Cost <br />Savings <br />$TDV <br />Savings <br />B/C <br />Ratio <br />(On -bill) <br />B/C <br />Ratio <br />(TDV) <br />NPV (On- <br />bill) <br />NPV <br />(TDV) <br />Package <br />113: Mixed Fuel + EE + PV + B <br />CZ01 <br />PG&E <br />107,694 <br />1288 <br />28.73 <br />9% <br />$228,341 <br />$366,509 <br />$295,731 <br />1.6 <br />1.3 <br />$138,168 <br />$67,390 <br />CZ02 <br />PG&E <br />130,144 <br />976 <br />31.14 <br />7% <br />$228,341 <br />$359,248 <br />$336,575 <br />1.6 <br />1.5 <br />$130,907 <br />$108,233 <br />CZ03 <br />PG&E <br />129,107 <br />1046 <br />31.57 <br />10% <br />$228,341 <br />$430,737 <br />$335,758 <br />1.9 <br />1.5 <br />$202,396 <br />$107,416 <br />CZ04 <br />PG&E <br />132,648 <br />395 <br />28.46 <br />6% <br />$229,194 <br />$355,406 <br />$338,455 <br />1.6 <br />1.5 <br />$126,212 <br />$109,262 <br />CZ04-2 <br />CPAU <br />132,556 <br />422 <br />28.59 <br />6% <br />$229,194 <br />$322,698 <br />$338,492 <br />1.4 <br />1.5 <br />$93,504 <br />$109,298 <br />CZ05 <br />PG&E <br />136,318 <br />1018 <br />32.73 <br />9% <br />$228,341 <br />$452,611 <br />$352,342 <br />2.0 <br />1.5 <br />$224,269 <br />$124,001 <br />CZ05-2 <br />SCG <br />136,318 <br />1018 <br />32.73 <br />9% <br />$228,341 <br />$446,858 <br />$352,342 <br />2.0 <br />1.5 <br />$218,516 <br />$124,001 <br />CZ06 <br />SCE <br />131,051 <br />418 <br />28.47 <br />8% <br />$229,194 <br />$217,728 <br />$336,843 <br />0.9 <br />1.5 <br />($11,466) <br />$107,649 <br />CZ06-2 <br />LADWP <br />131,051 <br />418 <br />28.47 <br />8% <br />$229,194 <br />$131,052 <br />$336,843 <br />0.6 <br />1.5 <br />($98,142) <br />$107,649 <br />CZ07 <br />SDG&E <br />136,359 <br />424 <br />29.63 <br />8% <br />$229,194 <br />$306,088 <br />$345,378 <br />1.3 <br />1.5 <br />$76,894 <br />$116,184 <br />CZ08 <br />SCE <br />132,539 <br />419 <br />28.85 <br />7% <br />$229,194 <br />$227,297 <br />$353,013 <br />1.0 <br />1.5 <br />($1,897) <br />$123,819 <br />CZ08-2 <br />LADWP <br />132,539 <br />419 <br />28.85 <br />7% <br />$229,194 <br />$134,739 <br />$353,013 <br />0.6 <br />1.5 <br />($94,455) <br />$123,819 <br />CZ09 <br />SCE <br />131,422 <br />406 <br />28.82 <br />6% <br />$229,194 <br />$230,791 <br />$343,665 <br />1.0 <br />1.5 <br />$1,597 <br />$114,471 <br />CZ09-2 <br />LADWP <br />131,422 <br />406 <br />28.82 <br />6% <br />$229,194 <br />$136,024 <br />$343,665 <br />0.6 <br />1.5 <br />($93,170) <br />$114,471 <br />CZ10 <br />SDG&E <br />134,146 <br />342 <br />29.05 <br />5% <br />$229,194 <br />$339,612 <br />$342,574 <br />1.5 <br />1.5 <br />$110,418 <br />$113,380 <br />CZ10-2 <br />SCE <br />134,146 <br />342 <br />29.05 <br />5% <br />$229,194 <br />$226,244 <br />$342,574 <br />1.0 <br />1.5 <br />($2,949) <br />$113,380 <br />CZ11 <br />PG&E <br />128,916 <br />325 <br />27.62 <br />4% <br />$229,194 <br />$352,831 <br />$337,208 <br />1.5 <br />1.5 <br />$123,637 <br />$108,014 <br />CZ12 <br />PG&E <br />131,226 <br />327 <br />28.04 <br />5% <br />$229,194 <br />$425,029 <br />$338,026 <br />1.9 <br />1.5 <br />$195,835 <br />$108,832 <br />CZ12-2 <br />SMUD <br />131,226 <br />327 <br />28.04 <br />5% <br />$229,194 <br />$213,176 <br />$338,026 <br />0.9 <br />1.5 <br />($16,018) <br />$108,832 <br />CZ13 <br />PG&E <br />127,258 <br />310 <br />27.33 <br />4% <br />$229,194 <br />$351,244 <br />$324,217 <br />1.5 <br />1.4 <br />$122,050 <br />$95,023 <br />CZ14 <br />SDG&E <br />147,017 <br />370 <br />30.96 <br />4% <br />$229,194 <br />$861,445 <br />$217,675 <br />3.8 <br />0.9 <br />$632,251 <br />($11,518) <br />CZ14-2 <br />SCE <br />147,017 <br />370 <br />30.96 <br />4% <br />$229,194 <br />$244,100 <br />$381,164 <br />1.1 <br />1.7 <br />$14,906 <br />$151,970 <br />CZ15 <br />SCE <br />137,180 <br />278 <br />29.12 <br />3% <br />$229,194 <br />$225,054 <br />$348,320 <br />1.0 <br />1.5 <br />($4,140) <br />$119,127 <br />CZ16 <br />PG&E <br />141,478 <br />1197 <br />34.60 <br />6% <br />$228,341 <br />$377,465 <br />$357,241 <br />1.7 <br />1.6 <br />$149,124 <br />$128,899 <br />CZ16-2 <br />LADWP <br />141,478 <br />1197 <br />34.60 <br />6% <br />$228,341 <br />$136,563 <br />$357,241 <br />0.6 <br />1.6 <br />($91,778) <br />$128,899 <br />44 <br />2019-07-25 <br />471 <br />