Laserfiche WebLink
7.A. - Page 221 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 34. Cost Effectiveness for Small Hotel Package 2 - All -Electric Federal Code Minimum <br />CZ <br />Utility <br />Elec <br />Savings <br />(kWh) <br />Gas <br />Savings <br />(therms) <br />GHG <br />Reductions <br />(mtons) <br />Comp- <br />liance <br />Margin <br />Incremental <br />Package Cost" <br />Lifecycle <br />Utility Cost <br />Savings <br />$TDV <br />Savings <br />B/C <br />Ratio <br />(On- <br />bill) <br />B/C <br />Ratio <br />(TDV) <br />NPV (On - <br />bill) <br />NPV (TDV) <br />Package 2: All -Electric Federal Code Minimum <br />CZ01 <br />PG&E <br />-159,802 <br />16917 <br />53.92 <br />-28% <br />($1,296,784) <br />($582,762) <br />($115,161) <br />2.2 <br />11.3 <br />$714,022 <br />$1,181,623 <br />CZ02 <br />PG&E <br />-118,739 <br />12677 <br />40.00 <br />-12% <br />($1,297,757) <br />($245,434) <br />($51,620) <br />5.3 <br />25.1 <br />$1,052,322 <br />$1,246,137 <br />CZ03 <br />PG&E <br />-110,595 <br />12322 <br />40.48 <br />-14% <br />($1,300,029) <br />($326,633) <br />($51,166) <br />4.0 <br />25.4 <br />$973,396 <br />$1,248,863 <br />CZ04 <br />PG&E <br />-113,404 <br />11927 <br />36.59 <br />-13% <br />($1,299,864) <br />($225,307) <br />($53,134) <br />5.8 <br />24.5 <br />$1,074,556 <br />$1,246,730 <br />CZ04-2 <br />CPAU <br />-113,404 <br />11927 <br />36.59 <br />-13% <br />($1,299,864) <br />($17,768) <br />($53,134) <br />73.2 <br />24.5 <br />$1,282,096 <br />$1,246,730 <br />CZ05 <br />PG&E <br />-108,605 <br />11960 <br />38.34 <br />-15% <br />($1,299,917) <br />($350,585) <br />($54,685) <br />3.7 <br />23.8 <br />$949,332 <br />$1,245,232 <br />CZ06 <br />SCE <br />-78,293 <br />8912 <br />29.36 <br />-5% <br />($1,300,058) <br />($61,534) <br />($28,043) <br />21.1 <br />46.4 <br />$1,238,524 <br />$1,272,015 <br />CZ06-2 <br />LA <br />-78,293 <br />8912 <br />29.36 <br />-5% <br />($1,300,058) <br />$43,200 <br />($28,043) <br />>1 <br />46.4 <br />$1,343,258 <br />$1,272,015 <br />CZ07 <br />SDG&E <br />-69,819 <br />8188 <br />28.04 <br />-7% <br />($1,298,406) <br />($137,638) <br />($23,199) <br />9.4 <br />56.0 <br />$1,160,768 <br />$1,275,207 <br />CZ08 <br />SCE <br />-71,914 <br />8353 <br />28.21 <br />-6% <br />($1,296,376) <br />($53,524) <br />($22,820) <br />24.2 <br />56.8 <br />$1,242,852 <br />$1,273,556 <br />CZ08-2 <br />LA <br />-71,914 <br />8353 <br />28.21 <br />-6% <br />($1,296,376) <br />$42,841 <br />($22,820) <br />>1 <br />56.8 <br />$1,339,217 <br />$1,273,556 <br />CZ09 <br />SCE <br />-72,262 <br />8402 <br />28.38 <br />-6% <br />($1,298,174) <br />($44,979) <br />($21,950) <br />28.9 <br />59.1 <br />$1,253,196 <br />$1,276,224 <br />CZ09-2 <br />LA <br />-72,262 <br />8402 <br />28.38 <br />-6% <br />($1,298,174) <br />$46,679 <br />($21,950) <br />>1 <br />59.1 <br />$1,344,853 <br />$1,276,224 <br />CZ10 <br />SDG&E <br />-80,062 <br />8418 <br />26.22 <br />-8% <br />($1,295,176) <br />($172,513) <br />($36,179) <br />7.5 <br />35.8 <br />$1,122,663 <br />$1,258,997 <br />CZ10-2 <br />SCE <br />-80,062 <br />8418 <br />26.22 <br />-8% <br />($1,295,176) <br />($63,974) <br />($36,179) <br />20.2 <br />35.8 <br />$1,231,202 <br />$1,258,997 <br />CZ11 <br />PG&E <br />-99,484 <br />10252 <br />30.99 <br />-10% <br />($1,295,985) <br />($186,037) <br />($49,387) <br />7.0 <br />26.2 <br />$1,109,948 <br />$1,246,598 <br />CZ12 <br />PG&E <br />-99,472 <br />10403 <br />32.08 <br />-10% <br />($1,297,425) <br />($340,801) <br />($45,565) <br />3.8 <br />28.5 <br />$956,624 <br />$1,251,860 <br />CZ12-2 <br />SMUD <br />-99,067 <br />10403 <br />32.21 <br />-10% <br />($1,297,425) <br />$5,794 <br />($44,354) <br />>1 <br />29.3 <br />$1,303,219 <br />$1,253,071 <br />CZ13 <br />PG&E <br />-96,829 <br />10029 <br />30.60 <br />-10% <br />($1,295,797) <br />($184,332) <br />($50,333) <br />7.0 <br />25.7 <br />$1,111,465 <br />$1,245,464 <br />CZ14 <br />SDG&E <br />-101,398 <br />10056 <br />29.68 <br />-11% <br />($1,296,156) <br />($325,928) <br />($56,578) <br />4.0 <br />22.9 <br />$970,228 <br />$1,239,578 <br />CZ14-2 <br />SCE <br />-101,398 <br />10056 <br />29.68 <br />-11% <br />($1,296,156) <br />($121,662) <br />($56,578) <br />10.7 <br />22.9 <br />$1,174,494 <br />$1,239,578 <br />CZ15 <br />SCE <br />-49,853 <br />5579 <br />18.07 <br />-4% <br />($1,294,276) <br />$209 <br />($21,420) <br />>1 <br />60.4 <br />$1,294,485 <br />$1,272,856 <br />CZ16 <br />PG&E <br />-216,708 <br />17599 <br />41.89 <br />-50% <br />($1,300,552) <br />($645,705) <br />($239,178) <br />2.0 <br />5.4 <br />$654,847 <br />$1,061,374 <br />CZ16-2 <br />LA <br />-216,708 <br />17599 <br />41.89 <br />-50% <br />($1,300,552) <br />$30,974 <br />($239,178) <br />>1 <br />5.4 <br />$1,331,526 <br />$1,061,374 <br />`The Incremental Package Cost is the addition of the incremental HVAC and water heating equipment costs from Figure 12, the electrical infrastructure <br />incremental cost of $26,800 (see section 3.3.2.1), and the natural gas infrastructure incremental cost savings of $56,020 (see section 3.3.2.2). <br />46 <br />2019-07-25 <br />473 <br />