Laserfiche WebLink
7.A. - Page 237 of 285 2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />percentages to the Small Hotel prototype domestic water heating energy in both the mixed -fuel and all - <br />electric to determine energy savings for the drain water heat recovery measure in the Small Hotel. The <br />Reach Code Team applied volumetric energy rates to estimate on -bill cost impacts from this measure. <br />6.4 Utility Rate Schedules <br />The Reach Codes Team used the IOU and POU rates depicted in Figure 46 to determine the On -Bill savings <br />for each prototype. <br />Figure 46. Utility Tariffs Analyzed Based on Climate Zone - Detailed View <br />Climate <br />Zones <br />Electric / <br />Electricity (Time -of -use) <br />Natural Gas <br />Gas Utility Medium Office <br />Medium Retail Small Hotel <br />All Prototypes <br />CZ01 <br />PG&E <br />A-10 <br />A-1 <br />A-1 or A-10 <br />G-NR1 <br />CZ02 <br />PG&E <br />A-10 <br />A-10 <br />A-1 or A-10 <br />G-NR1 <br />CZ03 <br />PG&E <br />A-10 <br />A-1 or A-10 <br />A-1 or A-10 <br />G-NR1 <br />CZ04 <br />PG&E <br />A-10 <br />A-10 <br />A-1 or A-10 <br />G-NR1 <br />CZ04-2 <br />CPAU/PG&E <br />E-2 <br />E-2 <br />E-2 <br />G-NR1 <br />CZ05 <br />PG&E <br />A-10 <br />A-1 <br />A-1 or A-10 <br />G-NR1 <br />CZ05-2 <br />PG&E/SCG <br />A-10 <br />A-1 <br />A-1 or A-10 <br />G-10 (GN -10) <br />CZ06 <br />SCE/SCG <br />TOU-GS-2 <br />TOU-GS-2 <br />TOU-GS-2 or TOU-GS-3 <br />G-10 (GN -10) <br />CZ06 <br />LADWP/SCG <br />TOU-GS-2 <br />TOU-GS-2 <br />TOU-GS-2 or TOU-GS-3 <br />G-10 (GN -10) <br />CZ07 <br />SDG&E <br />AL-TOU+EECC <br />(AL-TOU) <br />AL-TOU+EECC <br />(AL-TOU) <br />AL-TOU+EECC <br />(AL-TOU) <br />GN -3 <br />CZ08 <br />SCE/SCG <br />TOU-GS-2 <br />TOU-GS-2 <br />TOU-GS-2 or TOU-GS-3 <br />G-10 (GN -10) <br />CZ08-2 <br />LADWP/SCG <br />A-2 (B) <br />A-2 (B) <br />A-2 (B) <br />G-10 (GN -10) <br />CZ09 <br />SCE/SCG <br />TOU-GS-2 <br />TOU-GS-2 <br />TOU-GS-2 or TOU-GS-3 <br />G-10 (GN -10) <br />CZ09-2 <br />LADWP/SCG <br />A-2 (B) <br />A-2 (B) <br />A-2 (B) <br />G-10 (GN -10) <br />CZ10 <br />SCE/SCG <br />TOU-GS-2 <br />TOU-GS-2 <br />TOU-GS-2 <br />G-10 (GN -10) <br />CZ10-2 <br />SDG&E <br />AL-TOU+EECC <br />(AL-TOU) <br />AL-TOU+EECC <br />(AL-TOU) <br />AL-TOU+EECC <br />(AL-TOU) <br />GN -3 <br />CZ11 <br />PG&E <br />A-10 <br />A-10 <br />A-10 <br />G-NR1 <br />CZ12 <br />PG&E <br />A-10 <br />A-10 <br />A-1 or A-10 <br />G-NR1 <br />CZ12-2 <br />SMUD/PG&E <br />GS <br />GS <br />GS <br />G-NR1 <br />CZ13 <br />PG&E <br />A-10 <br />A-10 <br />A-10 <br />G-NR1 <br />CZ14 <br />SCE/SCG <br />TOU-GS-3 <br />TOU-GS-3 <br />TOU-GS-3 <br />G-10 (GN -10) <br />CZ14-2 <br />SDG&E <br />AL-TOU+EECC <br />(AL-TOU) <br />AL-TOU+EECC <br />(AL-TOU) <br />AL-TOU+EECC <br />(AL-TOU) <br />GN -3 <br />CZ15 <br />SCE/SCG <br />TOU-GS-3 <br />TOU-GS-2 <br />TOU-GS-2 <br />G-10 (GN -10) <br />CZ16 <br />PG&E <br />A-10 <br />A-10 <br />A-1 or A-10 <br />G-NR1 <br />CZ16-2 <br />LADWP/SCG <br />A-2 (B) <br />A-2 (B) <br />A-2 (B) <br />G-10 (GN -10) <br />M <br />RE <br />2019-07-25 <br />a.. <br />