Laserfiche WebLink
7.A. - Page 268 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 74. Cost Effectiveness for Small Hotel - All -Electric + 3kW PV <br />CZ <br />IOU territory <br />Elec <br />Savings <br />(kWh) <br />Gas <br />Savings <br />(therms) <br />GHG <br />savings <br />(tons) <br />Incremental <br />Package Cost* <br />Lifecycle <br />Energy Cost <br />Savings <br />Lifecycle <br />TDV Savings <br />B/C <br />Ratio <br />(On- <br />bill) <br />B/C <br />Ratio <br />(TDV) <br />NPV (On - <br />bill) <br />NPV (TDV) <br />All -Electric <br />+ 3kW PV <br />CZ01 <br />PG&E <br />-155,861 <br />16917 <br />54.7 <br />($1,265,139) <br />($568,892) <br />($106,835) <br />2.2 <br />11.8 <br />$696,246 <br />$1,158,304 <br />CZ02 <br />PG&E <br />-113,954 <br />12677 <br />40.9 <br />($1,266,111) <br />($229,433) <br />($41,288) <br />5.5 <br />30.7 <br />$1,036,679 <br />$1,224,823 <br />CZ03 <br />PG&E <br />-105,862 <br />12322 <br />41.4 <br />($1,268,383) <br />($309,874) <br />($41,175) <br />4.1 <br />30.8 <br />$958,510 <br />$1,227,208 <br />CZ04 <br />PG&E <br />-108,570 <br />11927 <br />37.5 <br />($1,268,218) <br />($208,239) <br />($42,689) <br />6.1 <br />29.7 <br />$1,059,980 <br />$1,225,530 <br />CZ04-2 <br />CPAU <br />-108,570 <br />11927 <br />37.5 <br />($1,268,218) <br />($6,261) <br />($42,689) <br />202.6 <br />29.7 <br />$1,261,958 <br />$1,225,530 <br />CZ05 <br />PG&E <br />-103,579 <br />11960 <br />39.3 <br />($1,268,272) <br />($332,879) <br />($44,051) <br />3.8 <br />28.8 <br />$935,393 <br />$1,224,221 <br />CZ06 <br />SCE <br />-73,524 <br />8912 <br />30.3 <br />($1,268,413) <br />$48,898 <br />($17,484) <br />>1 <br />72.5 <br />$1,317,311 <br />$1,250,929 <br />CZ06-2 <br />LA <br />-64,859 <br />8188 <br />29.0 <br />($1,266,760) <br />($120,842) <br />($12,337) <br />10.5 <br />102.7 <br />$1,145,918 <br />$1,254,423 <br />CZ07 <br />SDG&E <br />-67,090 <br />8353 <br />29.2 <br />($1,264,731) <br />($43,964) <br />($11,618) <br />28.8 <br />108.9 <br />$1,220,767 <br />$1,253,113 <br />CZ08 <br />SCE <br />-67,090 <br />8353 <br />29.2 <br />($1,264,731) <br />$48,736 <br />($11,618) <br />>1 <br />108.9 <br />$1,313,467 <br />$1,253,113 <br />CZ08-2 <br />LA <br />-67,483 <br />8402 <br />29.3 <br />($1,266,529) <br />($35,547) <br />($11,126) <br />35.6 <br />113.8 <br />$1,230,982 <br />$1,255,403 <br />CZ09 <br />SCE <br />-67,483 <br />8402 <br />29.3 <br />($1,266,529) <br />$52,410 <br />($11,126) <br />>1 <br />113.8 <br />$1,318,939 <br />$1,255,403 <br />CZ09-2 <br />LA <br />-75,157 <br />8418 <br />27.2 <br />($1,263,531) <br />($156,973) <br />($25,469) <br />8.0 <br />49.6 <br />$1,106,558 <br />$1,238,061 <br />CZ10 <br />SDG&E <br />-75,157 <br />8418 <br />27.2 <br />($1,263,531) <br />($54,711) <br />($25,469) <br />23.1 <br />49.6 <br />$1,208,820 <br />$1,238,061 <br />CZ10-2 <br />SCE <br />-94,783 <br />10252 <br />31.9 <br />($1,264,340) <br />($169,847) <br />($38,904) <br />7.4 <br />32.5 <br />$1,094,493 <br />$1,225,436 <br />CZ11 <br />PG&E <br />-94,702 <br />10403 <br />33.0 <br />($1,265,779) <br />($324,908) <br />($34,968) <br />3.9 <br />36.2 <br />$940,872 <br />$1,230,811 <br />CZ12 <br />PG&E <br />-94,297 <br />10403 <br />33.1 <br />($1,265,779) <br />$13,603 <br />($33,757) <br />>1 <br />37.5 <br />$1,279,382 <br />$1,232,022 <br />CZ12-2 <br />SMUD <br />-92,196 <br />10029 <br />31.5 <br />($1,264,152) <br />($168,358) <br />($40,229) <br />7.5 <br />31.4 <br />$1,095,794 <br />$1,223,923 <br />CZ13 <br />PG&E <br />-96,021 <br />10056 <br />30.7 <br />($1,264,510) <br />($308,542) <br />($44,202) <br />4.1 <br />28.6 <br />$955,969 <br />$1,220,308 <br />CZ14 <br />SDG&E <br />-96,021 <br />10056 <br />30.7 <br />($1,264,510) <br />($110,730) <br />($44,202) <br />11.4 <br />28.6 <br />$1,153,780 <br />$1,220,308 <br />CZ14-2 <br />SCE <br />-44,856 <br />5579 <br />19.0 <br />($1,262,631) <br />$8,996 <br />($10,256) <br />>1 <br />123.1 <br />$1,271,627 <br />$1,252,375 <br />CZ15 <br />SCE <br />-211,468 <br />17599 <br />42.9 <br />($1,268,907) <br />($625,671) <br />($228,203) <br />2.0 <br />5.6 <br />$643,236 <br />$1,040,704 <br />CZ16 <br />PG&E <br />-211,468 <br />17599 <br />42.9 <br />($1,268,907) <br />$37,142 <br />($228,203) <br />>1 <br />5.6 <br />$1,306,049 <br />$1,040,704 <br />CZ16-2 <br />LA <br />-155,861 <br />16917 <br />54.7 <br />($1,265,139) <br />($568,892) <br />($106,835) <br />2.2 <br />11.8 <br />$696,246 <br />$1,158,304 <br />ON <br />2019-07-25 <br />520 <br />