Laserfiche WebLink
7.A. - Page 270 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 76. Cost Effectiveness for Small Hotel - All -Electric + BO W PV <br />CZ <br />IOU territory <br />Elec <br />Savings <br />(kWh) <br />Gas <br />Savings <br />(therms) <br />GHG <br />savings <br />(tons) <br />Incremental <br />Package Cost <br />Lifecycle <br />Energy Cost <br />Savings <br />$-TDV <br />Savings <br />B/C <br />Ratio <br />(On- <br />bill) <br />B/C <br />Ratio <br />(TDV) <br />NPV (On - <br />bill) <br />NPV (TDV) <br />All -Electric <br />+ 80kW PV <br />CZ01 <br />PG&E <br />-54,712 <br />16917 <br />74.6 <br />($1,123,442) <br />($240,170) <br />$106,722 <br />4.7 <br />>1 <br />$883,272 <br />$1,230,164 <br />CZ02 <br />PG&E <br />8,853 <br />12677 <br />65.0 <br />($1,124,415) <br />$128,649 <br />$223,510 <br />>1 <br />>1 <br />$1,253,063 <br />$1,347,925 <br />CZ03 <br />PG&E <br />15,612 <br />12322 <br />65.3 <br />($1,126,687) <br />$44,532 <br />$215,260 <br />>1 <br />>1 <br />$1,171,219 <br />$1,341,947 <br />CZ04 <br />PG&E <br />15,490 <br />11927 <br />62.0 <br />($1,126,522) <br />$145,778 <br />$225,402 <br />>1 <br />>1 <br />$1,272,300 <br />$1,351,924 <br />CZ04-2 <br />CPAU <br />15,490 <br />11927 <br />62.0 <br />($1,126,522) <br />$289,094 <br />$225,402 <br />>1 <br />>1 <br />$1,415,616 <br />$1,351,924 <br />CZ05 <br />PG&E <br />25,436 <br />11960 <br />64.8 <br />($1,126,575) <br />$56,019 <br />$229,149 <br />>1 <br />>1 <br />$1,182,594 <br />$1,355,724 <br />CZ06 <br />SCE <br />48,875 <br />8912 <br />54.4 <br />($1,126,716) <br />$163,343 <br />$253,445 <br />>1 <br />>1 <br />$1,290,060 <br />$1,380,161 <br />CZ06-2 <br />LA <br />62,439 <br />8188 <br />54.1 <br />($1,125,064) <br />$115,822 <br />$266,502 <br />>1 <br />>1 <br />$1,240,886 <br />$1,391,565 <br />CZ07 <br />SDG&E <br />56,727 <br />8353 <br />53.5 <br />($1,123,034) <br />$147,987 <br />$275,773 <br />>1 <br />>1 <br />$1,271,022 <br />$1,398,808 <br />CZ08 <br />SCE <br />56,727 <br />8353 <br />53.5 <br />($1,123,034) <br />$163,971 <br />$275,773 <br />>1 <br />>1 <br />$1,287,005 <br />$1,398,808 <br />CZ08-2 <br />LA <br />55,185 <br />8402 <br />53.7 <br />($1,124,832) <br />$155,101 <br />$266,880 <br />>1 <br />>1 <br />$1,279,933 <br />$1,391,712 <br />CZ09 <br />SCE <br />55,185 <br />8402 <br />53.7 <br />($1,124,832) <br />$169,010 <br />$266,880 <br />>1 <br />>1 <br />$1,293,843 <br />$1,391,712 <br />CZ09-2 <br />LA <br />50,731 <br />8418 <br />52.0 <br />($1,121,834) <br />$113,936 <br />$249,207 <br />>1 <br />>1 <br />$1,235,770 <br />$1,371,041 <br />CZ10 <br />SDG&E <br />50,731 <br />8418 <br />52.0 <br />($1,121,834) <br />$138,265 <br />$249,207 <br />>1 <br />>1 <br />$1,260,099 <br />$1,371,041 <br />CZ10-2 <br />SCE <br />25,882 <br />10252 <br />55.6 <br />($1,122,643) <br />$162,626 <br />$229,944 <br />>1 <br />>1 <br />$1,285,269 <br />$1,352,587 <br />CZ11 <br />PG&E <br />27,731 <br />10403 <br />57.1 <br />($1,124,083) <br />$12,954 <br />$236,794 <br />>1 <br />>1 <br />$1,137,037 <br />$1,360,876 <br />CZ12 <br />PG&E <br />28,136 <br />10403 <br />57.2 <br />($1,124,083) <br />$206,756 <br />$238,005 <br />>1 <br />>1 <br />$1,330,839 <br />$1,362,087 <br />CZ12-2 <br />SMUD <br />26,706 <br />10029 <br />55.0 <br />($1,122,455) <br />$165,991 <br />$219,574 <br />>1 <br />>1 <br />$1,288,446 <br />$1,342,030 <br />CZ13 <br />PG&E <br />41,989 <br />10056 <br />57.8 <br />($1,122,814) <br />$22,333 <br />$273,768 <br />>1 <br />>1 <br />$1,145,147 <br />$1,396,582 <br />CZ14 <br />SDG&E <br />41,989 <br />10056 <br />57.8 <br />($1,122,814) <br />$120,943 <br />$273,768 <br />>1 <br />>1 <br />$1,243,757 <br />$1,396,582 <br />CZ14-2 <br />SCE <br />83,393 <br />5579 <br />44.0 <br />($1,120,934) <br />$210,511 <br />$276,228 <br />>1 <br />>1 <br />$1,331,445 <br />$1,397,162 <br />CZ15 <br />SCE <br />-76,971 <br />17599 <br />69.2 <br />($1,127,210) <br />($199,308) <br />$53,550 <br />5.7 <br />>1 <br />$927,902 <br />$1,180,760 <br />CZ16 <br />PG&E <br />-76,971 <br />17599 <br />69.2 <br />($1,127,210) <br />$172,787 <br />$53,550 <br />>1 <br />>1 <br />$1,299,997 <br />$1,180,760 <br />CZ16-2 <br />LA <br />-54,712 <br />16917 <br />74.6 <br />($1,123,442) <br />($240,170) <br />$106,722 <br />4.7 <br />>1 <br />$883,272 <br />$1,230,164 <br />ON <br />2019-07-25 <br />522 <br />