Laserfiche WebLink
7.A. - Page 280 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 81. Healdsburg Utility Rates Analysis - Small Hotel, All Packages Cost Effectiveness Summary <br />Prototype <br />Package <br />Elec <br />Savings <br />(kWh) <br />Gas <br />Savings <br />(therms) <br />GHG <br />savings <br />(tons) <br />Comp- <br />liance <br />Margin <br />N <br />Incremental <br />Package <br />Cost <br />Lifecycle <br />Energy <br />Cost <br />Savings <br />$-TDV <br />Savings <br />B/C <br />Ratio <br />(On- <br />bill) <br />B/C <br />Ratio <br />(TDV) <br />NPV (On - <br />bill) <br />NPV (TDV) <br />Mixed Fuel + EE <br />3,802 <br />976 <br />3.9 <br />7% <br />$20,971 <br />$22,829 <br />$29,353 <br />1.1 <br />1.4 <br />$1,857 <br />$8,381 <br />Mixed Fuel + EE + PVB <br />130,144 <br />976 <br />31.1 <br />7% <br />$205,967 <br />$254,577 <br />$336,575 <br />1.2 <br />1.6 <br />$48,610 <br />$130,608 <br />Mixed Fuel + HE <br />981 <br />402 <br />2.7 <br />3% <br />$23,092 <br />$12,291 <br />$11,808 <br />0.5 <br />0.5 <br />-$10,801 <br />-$11,284 <br />All -Electric <br />118,739 <br />12,677 <br />40.0 <br />-12% <br />-$1,297,757 <br />-$24,318 <br />-$51,620 <br />53.4 <br />25.1 <br />$1,273,439 <br />$1,246,137 <br />All -Electric + EE <br />-88,410 <br />12,677 <br />45.9 <br />1 5% <br />-$1,265,064 <br />$45,918 <br />$20,860 <br />>1 <br />>1 <br />$1,310,982 <br />$1,285,924 <br />All -Electric + EE + PVB <br />38,115 <br />12,677 <br />73.5 <br />5% <br />-$1,080,068 <br />$296,233 <br />$317,296 <br />>1 <br />>1 <br />$1,376,301 <br />$1,397,365 <br />Small <br />-All-Electric + HE ------- <br />---------- <br />Mixed Fuel + 3kW <br />118,284 <br />------ <br />4,785 <br />12,677 <br />------ <br />0 <br />41.2 <br />-------------------- <br />-- <br />0.9 <br />-11%-- <br />- <br />n/a <br />---$1,283,243- <br />$5,566 <br />---$83,994 <br />$8,927 <br />-$44,50515.3 <br />------ <br />$10,332 <br />----- <br />1.6 <br />28.8 <br />----- <br />1.9 <br />$1,199,249 <br />-------- <br />$3,361 <br />$1,238,738 <br />-------- <br />$4,766 <br />Hotel <br />Mixed Fuel + 3kW + 5kWh <br />4,785 <br />0 <br />0.9 <br />n/a <br />$8,356 <br />$8,927 <br />$10,332 <br />1.1 <br />1.2 <br />$571 <br />$1,976 <br />Mixed Fuel +80kW <br />127,592 <br />0 <br />25.0 <br />n/a <br />$148,427 <br />$229,794 <br />$275,130 <br />1.5 <br />1.9 <br />$81,367 <br />$126,703 <br />Mixed Fuel + 80kW + <br />50kWh <br />126,332 <br />0 <br />28.1 <br />n/a <br />$176,327 <br />$236,570 <br />$296,058 <br />1.3 <br />1.7 <br />$60,243 <br />$119,731 <br />All -Electric + 3kW <br />113,954 <br />12,677 <br />40.9 <br />n/a <br />-$1,292,191 <br />-$14,447 <br />-$41,288 <br />89.4 <br />31.3 <br />$1,277,744 <br />$1,250,902 <br />All -Electric + 3kW + 5kWh <br />113,954 <br />12,677 <br />40.9 <br />n/a <br />-$1,289,401 <br />-$14,447 <br />-$41,288 <br />89.3 <br />31.2 <br />$1,274,954 <br />$1,248,112 <br />All -Electric + 80kW <br />8,853 <br />12,677 <br />65.0 <br />n/a <br />-$1,149,330 <br />$222,070 <br />$223,510 <br />>1 <br />>1 <br />$1,371,400 <br />$1,372,840 <br />All -Electric + 80kW + <br />50kWh <br />7,849 <br />12,677 <br />67.4 <br />n/a <br />-$1,121,430 <br />$223,812 <br />$239,632 <br />>1 <br />>1 <br />$1,345,241 <br />$1,361,062 <br />105 <br />2019-07-25 <br />532 <br />