My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 18 of 70 <br />Redwood City Transit Center Redesign Study <br />Summary Report <br />limited service levels. Most routes provide service every 30 <br />to 60 minutes, but two routes (ECR and 296) offer 15 -minute <br />weekday service and one route (ECR Rapid) offers 20 -minute <br />weekday service. In total, some 328 bus trips passed through <br />the center on an average weekday, while 163 trips served the <br />center on Saturdays, and 139 trips on Sundays. <br />Parking <br />There are three parking areas which provide a total of 533 <br />spaces for Transit Center users at a cost of $5.00 per day. <br />While the main station lot typically fills up each weekday, the <br />other two facilities, the Perry Street lot and the underground <br />parking in the Sequoia Station garage, do not fill up and on <br />average 59% is the peak weekday occupancy of the parking. <br />Transit Center Amenities <br />The Transit Center is lacking in passenger amenities and <br />overall urban design, visual quality, and adequate pedestrian <br />and bicycle access. The bus station was designed without <br />much consideration of architectural integration with the <br />Caltrain Station. It is an uninviting environment especially <br />for pedestrians. All the buildings adjacent to the Transit <br />Center with the exception of the new Box office building, <br />show their undecorated back or side walls to those using the <br />Center. Nearby creekside green space along James Avenue <br />and the public space on Broadway are not integrated into the <br />Transit Center site. Signage and wayfinding are inconsistent, <br />and the Transit Center is not well identified from El Camino <br />Real. The 2017 Caltrain Bike Parking Management Plan <br />Smith <br />indicated that the Transit Center lacks sufficient secure <br />bicycle storage. Bike lockers are located north of Broadway <br />in the Perry Street parking lot, somewhat removed from the <br />station. <br />Pedestrian circulation is difficult along the Winslow Street <br />frontage of the Transit Center, as a railing limits access to the <br />Caltrain platform. Many people walk through this area to <br />reach Broadway, conflicting with passengers waiting to <br />board trains on the narrow platform. There is a key <br />pedestrian crossing of the tracks in this area that is also the <br />linkage between the Downtown and the bus station and <br />Sequoia Station which are both on the opposite side of the <br />tracks. The design of the bus station allows pedestrians to <br />cross bus bays in a random pattern which poses safety <br />issues, and SamTrans reported that there had been a recent <br />pedestrian fatality at the station. <br />Land Use and Zoning <br />The area directly surrounding the Transit Center is for the <br />most part dedicated to streets and parking, and thus to <br />automobiles. Commercial uses surround the Transit Center <br />study area, and while Broadway provides a pedestrian - <br />oriented destination, Sequoia Station does not. However, the <br />applicable development regulations lay the foundation for a <br />more transit -supportive built environment surrounding the <br />Transit Center if and when properties redevelop in the <br />future. The proposed redevelopment of the Sequoia Station <br />commercial property represents a significant opportunity to <br />Page 6 <br />561 <br />
The URL can be used to link to this page
Your browser does not support the video tag.