My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.113. - Page 23 of 70 <br />Redwood City Transit Center Redesign Study <br />Summary Report <br />■ Priorities for improvements <br />■ Other suggestions and comments <br />Over 340 responses were received. Common themes <br />included: <br />■ Most people arrive at the station by walking or driving <br />■ Convenience and frequency of trains are high priorities <br />■ Top station improvements include safety, cleanliness, <br />and sheltered waiting area <br />■ Improved pedestrian and vehicular access from <br />El Camino Real are key considerations <br />HOW DO YOU TRAVEL TO/FROM THE TRANSIT STATION? <br />s <br />NIP <br />h <br />B: 1 1 1 <br />OTHER BUS CARPOOL OTHER SAMTRANS RIDESHARE BIKE DROPPED -CFF WALK DRIVE <br />OR SHUTTLE BNS <br />Design Alternatives <br />A number of alternatives for the redesign of the Transit <br />Center were developed and considered. Two timeframes <br />were assumed for making changes: <br />■ Phase 1- Short Term: low-cost improvements that <br />could be done in the immediate future <br />■ Phase 2 - Long Term: major redesign, two types of <br />options: <br />• (1) further improvements at the existing site, and <br />• (2) relocation of the Transit Center in the event <br />WHAT ARE THE TOP CHANGES TO THE TRANSIT STATION <br />THAT YOU WOULD LIKE TO SEE? <br />BETTER DR MORE FREQUENT HUS CONNECTIONS TO PLACES I LRRRR <br />NEED TO GO .+ <br />MORE SHELTERED WAITING AREAS <br />CLEARER INFO ABOUT SCHEDULES & TRANSFERS <br />IMPROVED PEDESTRIAN CROSSINGS O <br />............. .... ....................................... <br />A REAL INDOOR "STATION" WITH INFORMATION, WAITING <br />AREAS, AND FOOD SERVICES <br />OTHER (SEE COMMENTSk <br />PARKING - ADDITIONAL SPACES OR MORE CONVENIENT <br />BETTER VISIBLITY & ACCESS FROM EL CAMINO OR DOWNTOWN <br />ART -MURALS, SCULPTURES, OR OTHER ARTWORKS -M <br />that the Caltrain platform is moved north to <br />566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.