8.B. - Page 31 of 70 <br />Redwood City Transit Center Redesign Study <br />Summary Report <br />Phase 2 — Long Term: Perry Street Site <br />For the long-term option in which the Caltrain station would <br />be shifted a block north, the bus station would also be moved <br />to Perry Street. This street is currently adjacent to a transit <br />patron parking lot (Figure 5) that would be transformed to <br />the Caltrain station area (Figure 6). Between Brewster <br />Avenue and Commercial Way, Perry Street would be <br />reserved for the two-way flow of buses, with other traffic <br />prohibited. The left-most lane in each direction would <br />accommodate moving buses, while each curb lane would <br />provide space for bus stops. Those stops along the curb <br />adjacent to the Caltrain station would use a modified <br />sawtooth design; along the opposite curb, buses would stop <br />parallel to the sidewalk in the conventional manner. As in the <br />Phase 2 design for the existing Transit Center site, eleven bus <br />bays could be accommodated. <br />Although the Perry Street site is approximately one block <br />further from the Downtown core than the existing Transit <br />Center, it has the advantage of a consolidated configuration <br />with the buses located immediately adjacent to the Caltrain <br />platform. Arguello Street would provide a convenient <br />location for passenger drop-off and pick-up and would also <br />be a viable location for the terminus of the proposed <br />streetcar/urban circulator. In summary, the features of a <br />relocated Transit Center on the Perry Street site include: <br />■ Adequate space to accommodate Caltrain Business <br />Plan's recommended alternative, Dumbarton Rail <br />Corridor project, and high-speed rail <br />■ All transit functions occur in one area <br />■ A new linear bus transit center relocated to <br />Perry Street which provides eleven bus bays for both <br />boarding/alighting and layovers <br />■ A drop-off area for taxis and TNC vehicles on <br />Arguello Street <br />■ Potential for a bicycle and pedestrian undercrossing <br />between two sides of the tracks <br />■ The existing Transit Center site can be redeveloped <br />■ Creates opportunities for new development on the <br />Perry Street side of the Transit Center <br />■ Displaces the existing 135 parking space on Perry <br />Street Caltrain parking lot. Assumes the bus portion of <br />the Transit Center, including the 90 space parking lot, <br />would be redeveloped. Station parking at Sequoia <br />Station would be well removed from the new Transit <br />Center. A new parking facility would be desirable in <br />the area south of Arguello Street, adjacent to the <br />Transit Center. <br />Smith <br />574 <br />