My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.13. - Page 41 of 70 <br />Redwood City Broadway Streetcar/Urban Circulator Study <br />Summary Report <br />Public and Stakeholder Holder <br />Outreach <br />Outreach and public involvement were an important element <br />in the streetcar and urban circulator study. The City had a <br />number of planning studies occurring in the same time frame <br />including the: <br />■ Downtown Transit Center Redesign Studyz <br />■ El Camino Real Corridor Plan <br />■ Citywide Transportation Plan (RWCmoves) and <br />Travel Demand Management (TDM) Plan <br />To avoid confusing the public and to make it easier for <br />people to participate, some of the public meetings and events <br />were consolidated. <br />Public Meetings <br />Three meetings were held: <br />■ November 16, 2017 5 - 8 p.m. workshop in <br />conjunction with outreach for RWCmoves at the <br />PAL Building <br />2 Summarized in the Nov. 6, 2017 draft memorandum "Redwood City <br />Downtown Transit Center Redesign" <br />Smith <br />■ November 29, 2017 5 - 8 p.m. workshop in <br />conjunction with outreach for RWCmoves at <br />Redwood Shores Library <br />■ December 9, 2017 10 a.m. - 1 p.m. workshop in <br />conjunction with outreach for RWCmoves at Kennedy <br />Middle School <br />�� � 11111 ,.■ ��� .. ,., 11 1 1 1 � i � <br />/®NES <br />RW[ <br />1 1 <br />An online survey was conducted that focused mostly on the <br />Downtown Transit Center Redesign Project, while it also <br />included questions about the streetcar. Generally, at all the <br />events the idea of a streetcar or urban circulator was well <br />received. <br />However, some respondents questioned whether a streetcar <br />would be an effective use of funds and when asked which <br />mode they would prefer using to get to and from the Transit <br />Page 5 <br />584 <br />
The URL can be used to link to this page
Your browser does not support the video tag.