My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.13. - Page 52 of 70 <br />Redwood City Broadway Streetcar/Urban Circulator Study <br />Summary Report <br />Route Alternatives <br />The Broadway Streetcar would connect from Second Avenue <br />near the Stanford in Redwood City development near <br />Douglas and Broadway to the downtown Transit Center. The <br />streetcar would run along Broadway from Second Avenue to <br />Maple Street (the "common segment"), but in downtown <br />there are multiple alternative alignments to reach the Transit <br />Center. <br />Along the common segment, the streetcar would run on the <br />outer sides of the street except for a center median terminus <br />at Second Avenue. There would be four intermediate stops <br />along this segment. <br />The downtown segment of the streetcar could take one of <br />many different paths from the Broadway corridor to the <br />Transit Center. Six initial alternatives were developed to <br />show the range of alignment options for the streetcar. The <br />streetcar alternatives either continue straight along <br />Broadway or take Marshall Street, then either end at the <br />Marshall/Broadway intersection, turn south on Winslow to <br />stub end in front of the existing transit plaza, or make a loop. <br />A seventh alternative represents an extended route that <br />would only be feasible for an urban circulator. The urban <br />circulator route was designed to take advantage of the <br />flexibility of this mode by maximizing the destinations <br />reached by the circulator, but the actual route may change <br />based on road conditions and new development. <br />Evaluation Criteria <br />To evaluate the route alternatives, criteria were developed <br />based on key feasibility and effectiveness measures. For each <br />criterion described below, a quantitative or qualitative <br />analysis was made to compare the route alternatives and a <br />numeric score was assigned. <br />Key Planning Considerations <br />■ Connection to Transit Center (existing and future) <br />■ Compatibility with special events on Broadway <br />■ Relationship to existing and planned development <br />■ Speed and travel times <br />■ Ridership potential <br />■ Safety <br />■ Reliability <br />■ Environmental impacts <br />Key Engineering Considerations <br />■ Turnaround/terminus configuration <br />■ Street cross-sections <br />■ Maintenance facility location <br />■ Conflicts with utilities <br />■ Costs (capital and operating) <br />■ Interface with traffic, bicycles, pedestrians and parking <br />Smith <br />595 <br />
The URL can be used to link to this page
Your browser does not support the video tag.