My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 70 of 70 <br />Redwood City Broadway Streetcar/Urban Circulator Study <br />Summary Report <br />Next Steps <br />■ The first step would be to use this feasibility study as a <br />vehicle to gauge the level of interest at the local, <br />county, and regional levels for the project. <br />■ This would involve continuing the discussions with the <br />public and private stakeholders that have participated <br />in this study, and taking steps to identify and secure <br />funding for the project. <br />■ Discussions should be held with the SMCTA, MTC and <br />Caltrans to determine their level of interest and <br />support and their requirements for funding. <br />■ When a decision has been made to continue with the <br />project, the next step would be to conduct the <br />necessary environmental and preliminary design <br />studies. <br />Smith <br />Page 34 <br />613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.