Laserfiche WebLink
Red® <br />17 of 19 Transit Center Redesign and <br />Broadway Streetcar Feasibility Studies <br />Construction <br />One-way travel <br />cost <br />time <br />Annual <br />Daily <br />(to serve the existing <br />(transit center to <br />transit center) <br />operating cost <br />ridership <br />Broadway/2nd) <br />Streetcar on <br />$152 M <br />$1.9 M <br />211200-311900 <br />13 min. <br />Broadway <br />Streetcar on <br />Broadway - <br />$158 M <br />$1.9 M <br />2,200-3,900 <br />13 min. <br />Marshall <br />Urban <br />$14 M <br />$1.2 M <br />11900-31400 <br />18 min. <br />Circulator <br />Red® <br />17 of 19 Transit Center Redesign and <br />Broadway Streetcar Feasibility Studies <br />