Laserfiche WebLink
CLK-Pamela Aguilar <br />From: ROLAND KURZ <roland422@comcast.net> <br />Sent: Monday, January 13, 2020 3:24 PM <br />To: GRP -City Council <br />Subject: over reach code <br />Good afternoon council members, <br />unfortunately I will not be able to be at the meeting tonight. Based on the staff report that I read and <br />the previous meetings that I have attended including the Building Board of Review meeting, the city <br />council will be making the decision based on what they want for their own goals and not what works <br />best for the entire city as whole. <br />1. Reach code does not have enough documentation to demonstrate that it is cost effective. <br />Incentives from,PCE and PG&E to offset costs. Incentives are not a guarantee and should not be <br />used as a cost offset or as part of a feasibility for a project. <br />2. If all electric is used it would violate energy code, since there is no complete feasibility study for all <br />types of construction, building uses, etc.. <br />3. Concrete being used for construction. Concrete is necessary for many types of construction and <br />should not be considered as part of an energy code. Redwood City is in a high seismic zone and <br />construction materials and design are identified in the building code, not energy code. All building <br />materials have pluses and minuses, and the manufacturing, transportation and installation of these <br />product. <br />4. would it be more cost effective for Redwood City to see what the outcome of the litigation that is in <br />court against other cities reach code, before The redwood city tax payers are forced to burden the <br />costs of litigation from adopting an all electric reach code. <br />5. it is clear after attending the numerous council meetings, that there are certain council members <br />that are not looking at the big picture and only at their own desires based on their affiliation with PCE. <br />Their statements in regards to the age of people who oppose the reach code, and those peoples <br />knowledge of new products, insinuating that at their age they do not know about innovations is <br />inappropriate, insulting and greatly inaccurate. <br />6. The letter from PG&E is nothing more than an empty promise. They are looking forward to being <br />able to charge customers for the increase to the utility bill, since they are now in bankruptcy and in <br />debt to FEMA. As I have mentioned numerous times, the customer will be the one responsible for the <br />cost to the infrastructure upgrade. I doubt anyone will be able to address and improve the extreme <br />delays from PG&E in regards to getting a project through PG&E, including installation and <br />energization by PG&E. Basic projects take 14 months though PG&E Engineering department and up <br />to 4 months to energize the service, once the city has tagged the electrical equipment. <br />There is innovation taking place in all types of products, not just electrical. All innovations should be <br />taken into consideration. Why would we eliminate them. <br />