My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Robert A. Bothman Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 Robert A. Bothman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 11:10:37 AM
Creation date
2/4/2020 3:13:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Robert A. Bothman Construction, Inc.
PROJECT NAME
Magical Bridge Playground
RMP File Number
304
Date
1/17/2020
Reso Ref
15765
MO Ref
18-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROBERT A <br />BOTH MAN TO GENERAL ENGINEERING AND BUILDING CONTRACTORS <br />2690 Scott Rmdevard, Santa Clara, CA 95050 - Phone: 408.2791277 • Fax: 408.279.9045 • sme.hothman.com <br />CO RI STRUCTI O N <br />California License 440332 • Nevada License 0027271 • Arizona License 150057 • Hawaii License AC -026294 <br />DAILY EXTRA WORK REPORT <br />Job Name: __14 <br />Work Performed for: <br />Description of Work: <br />EQUIPMENT HOURS HOURLY EXTENDED <br />RATE AMOUNTS <br />�p <br />TOTAL EQUIPMENT <br />MATERIAL AND/OR SUB -CONTRACT WORK <br />DESCRIPTION NO. UNIT UNIT COST EXTENSION <br />TOTAL MATERIALS, SUB -CONTRACTOR <br />TOTAL EQUIPMENT, MATERIALS, SUBS. <br />Date: <br />Robert A. Rothman, Inc. <br />ACCEPTANCE FOR PROGRESS PAYMENT <br />DATE: <br />Owner's Representative <br />WHITE -Agency (Executed) <br />Repos t # <br />Job//# <br />Date Performed: 3': <br />of <br />LABOR HOURS 'HUATE <br />URL' <br />R <br />YA O.T. -_ ---_ <br />-DREG. —_- <br />-- --- <br />J .. / eiS�i✓ IREG. --] <br />REG <br />T.T--__ — — <br />REG <br />6T <br />REG. <br />}O.T <br />_— —_—.— - _- IREG. <br />---- -- - ro.r. <br />EG, <br />UT <br />REG <br />--- --'O.T -. <br />SUB -TOTAL <br />LABOR SURCHARGE: <br />OTHER: <br />TOTAL COST OF LABOR A <br />EXTENDED <br />AMOUNTS <br />+ __ % MARKUP ON LABOR (A) <br />- - i- <br />._ + % MARKUP ON EQUIPMENT (B) <br />MATERIALS, SUB -CONTRACTOR <br />TOTAL THIS REPORT <br />YELLOW - Accounting PINK - Project Manager GOLD - Agency(Fielc) <br />
The URL can be used to link to this page
Your browser does not support the video tag.