My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Robert A. Bothman Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 Robert A. Bothman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 11:10:37 AM
Creation date
2/4/2020 3:13:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Robert A. Bothman Construction, Inc.
PROJECT NAME
Magical Bridge Playground
RMP File Number
304
Date
1/17/2020
Reso Ref
15765
MO Ref
18-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROBERT A <br />BOTH MANNO GENERAL ENGINEERING AND BUILDING CONTRACTORS <br />2191) Scott Ilmdevard, Santa Clara, CA 95050 • Plmne: 408.279.2277 • Pas: 408.279.9045 • nm.bothman.com <br />CONSTRUCTION California License 440332 • Nevada License 0027271 -Arizona License 1511057 • H:maii License AC -026293 <br />DAILY EXTRA WORK REPORT <br />Joh Name: <br />Work Perforated for: <br />Description of Work: <br />EQUIPMENT <br />I <br />HOURS I HOURLY <br />RATE <br />TOTAL EQUIPMENT <br />EXTENDED <br />AMOUNTS <br />MATERIAL AND/OR SUB -CONTRACT WORK <br />DESCRIPTION NO. UNIT UNIT COST EXTENSION <br />TOTAL MATERIALS, SUB -CONTRACTOR <br />TOTAL EQUIPMENT, MATERIALS, SUBS. <br />Date: <br />Robert A. Bothman, Inc. <br />ACCEPTANCE FOR PROGRESS PAYMENT <br />-- _ DATE: <br />Owner's Representative <br />WHITE -Agency (Executed) YELLOW - Accounting <br />Report # <br />Job #_ <br />Date Performed: /6 "— <br />Date of Report Z�' —ZZ—/y <br />LABOR I HOURS HOURLY EXTENDED <br />RATE AMOUNTS <br />REG <br />O.T. <br />_REG. <br />OT <br />OT _ <br />O.T. <br />--_--_ —. AEG. <br />O.T <br />IREG. <br />O.T <br />IREG, <br />IREG. <br />- <br />--REG. — - -- – — – I - <br />I <br />I <br />O.T. <br />SUB -TOTAL <br />LABOR SURCHARGE: <br />OTHER: <br />TOTAL COST OF LABOR <br />I <br />+ - % MARKUP ON LABOR (A) <br />+ ____ % MARKUP ON EQUIPMENT (B) <br />MATERIALS, SUB -CONTRACTOR <br />TOTAL THIS REPORT <br />PINK - Project Manager GOLD - Agency(Field) <br />150278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.