My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:31:49 AM
Creation date
2/7/2020 2:47:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 69 of 70 <br />Task D.3 - Identify Programmatic TDM Measures and Strategies <br />AECOM will develop a list of programmatic measures and strategies from the TDM <br />plan and identify those that would be most effective for the project. The selected <br />strategies will be organized into two categories: <br />Property Management -Provided Measures for residents and employees: information <br />center, transportation coordinator, carpool/vanpool matching services, onsite car <br />share services, etc.; <br />Tenant -Provided Measures for employees: subsidized transit passes, parking cash - <br />out, carpool/vanpool matching services, emergency ride home. <br />Task DA - Estimate Reductions <br />AECOM will use its TDM- tool to estimate the percentage reduction in office <br />employee trips that may occur with implementation of the TDM measures and <br />strategies. AECOM's TDM+ tool quantifies the effectiveness of individual and <br />grouped TDM strategies quickly and for a more refined geographic scale than other <br />available models. AECOM's MainStreet tool estimates trip generation for mixed use, <br />compact, infill and transit -oriented developments by considering location and land use <br />characteristics that are not addressed by generic trip generation methodologies. <br />AECOM will also use the C/CAG methodology to estimate the corresponding trip <br />credits. <br />Deliverable: Draft list of strategies and associated VMT reductions <br />Task D.5 - Prepare TDM Plan <br />The results of the previous tasks will be summarized in a TDM Plan document. It will <br />include descriptions of the measures, the intended audience (e.g., office employees <br />or residents), and the party responsible for implementation. The plan will include <br />monitoring and reporting requirements of the City of Redwood City. The draft will be <br />submitted to the City for review and comment. Responses to one set of consolidated <br />comments will be incorporated into the final plan. <br />Deliverable: Draft and final TDM plan <br />Schedule <br />Optional Tasks B and C will be coordinated with the Initial Study effort and would <br />commence within 20 business days of the Notice to Proceed as directed by the City. <br />The draft technical reports will be provided by AECOM to the City within 6 weeks <br />following the site visits, at which time a meeting can be scheduled with the City and <br />the applicant as necessary. Task D would commence following completion of the <br />transportation study, and would be completed within 10 weeks from initiation, as <br />directed by the City. <br />Cost <br />The level of effort for each optional task is summarized in the table below. <br />Page 36 of 37 <br />ATTY/AGR/2018.270/AEC0M PSA <br />REV: 12-07-18 PR <br />132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.