My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:31:49 AM
Creation date
2/7/2020 2:47:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 53 of 56 <br />E=XHIBIT "C" <br />Pervious Paving & Green Roof System Maintenance Plan for <br />910 Woodside Road, Redwood City, CA <br />PERVIOUS.PAVING <br />October 30, 2019 <br />Project Address and Crass Streets 910 Woodside toad {Near Union Ave. & Kontfreld Ave.) <br />Assessor's Parcel Ni)-: 05M72-430 & 440 <br />Property Ovrfrer. Valera Fooksman Prone No.:. <br />Designated Contact- Phone No <br />Mailing Address-_ ....... <br />The tern `pervious periwig" enwmpasses a range of paved swrmwater Ireatment <br />pracbiaes, including pervious concrete or porous asphalt, as well as paging stones with <br />permeable joints ("permeable joint pavers"), paving stones or pavers that are permeable <br />themselves, and turf blocks. These different types of pervious paving faciKes all <br />accomplish a sirnilarfunction by allowing infiltration of storrnwater- <br />The property contains 4 area of pervious paving, laeWed as described below and as <br />shown in the attached site plan', <br />Pervious Paving Facility No. I is a located along the -ear and two side property lines. <br />1. Routine Maintenance Activities <br />Routine mairilenance activities for perviotr& paving facilities, and the frequency at which <br />they will be conducted, are shown in Table 1. Note that there is some variation in <br />maintenance requirements depending on the type of pavement For example, vacuum <br />sweeping is generally required for pervious pavement, but is prohibited for permeable joins <br />pa vera that use sand in the join Es between pavers. <br />In addition to, pr in support of, any routine maintenance activities identified, here, pervious <br />paging products should be maintairmk in accordance with any manufacWrer's instructions. <br />Where applicable, manufacturer's inskructien0maintenaricn guidelines for pervious paving <br />products should be included as an attachment to this plan - <br />Table i <br />Routine Mluntenance Activities for Pervious Pavirra <br />Flo. Maintananca Task Frequency of Task <br />1 Check for sediment and debris accumolation Pleven# Two to four times annually <br />soil from -nhing or blowing onto the pavemerd. Do riot <br />store sand, sail, mulch ar ather landsr ping materials <br />on pervious pavement surfacm.- <br />Cnndud pDavenlative surface cleaning, using Two to four times annually <br />oammemially availE 3 regeneraPwe air w vacuum <br />sweepers, to remove sediment and diabris <br />Inspect for any signs of povemeni failure. Repair arry <br />surFaoe defx r—atior s 7r brvkeo payers. Repia;e <br />missiN joint filler in PIC F. <br />Two to four times annually <br />' Attached site plan rnual rnabch the site plan exhiU to Maintenance Ar reEmert <br />gage 1 <br />REV: 01-23-20 PR <br />ATTY/AGR.2020.012/Valera Fooksman (Page 13 of 16) <br />IT -111-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.