My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:31:49 AM
Creation date
2/7/2020 2:47:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 56 of 56 <br />The areas of gran tooling are indicated on the s1>~a lW Green Roof Area Plan- 'The area is comprised of <br />four Ne�fions having a total of 1,827 square feet. See the attached Exhibit entitled -LiveRoof Standard <br />System" by LiivcRuof, LLC; for a typical roof sucflon and details. 11c, building is structurally designed to <br />hand le the load and water -proofing. The additional loads that the pow roof pla m on the stnicture have <br />beeal added to the structural consideratiens and are included in the struc4 ral calculations. <br />The 1.iveRont; H -C product i,tcluding wauterproofnig memhaatrie will be it filed by Flmasouroe, Ltd, an <br />authorized Cal ikmia rooftop installer of the LiveRoof products, LiveRoof product installaticm includes a <br />special membrane which twill be installed by plora4soutee, Ltd., in coordhiatian wilt the work of the <br />general ark} roofing contracwrs of the project- <br />Livelkoofblaintenance Reouirerncnta; <br />Maintenance of the green roof wiIl be the responsi bility of the proj cct homeowner's amsociation and <br />should loilow the appropriate LivcRouf maintcnance protocul. <br />IRRIGATION. Per manufacturer's spacificatioos, in northern North America, inigadon is not needed to <br />keep tho grwn roof alivc during some summers providod it is populated with Sodums and contains a <br />minimum of4'/V sail (LiveRoof Standard modules) - <br />BIWEEKLY WEED WALKS: Twice monthly, conduct ser iruipcction of 6e green roof system. Simply <br />pull any and all weeds, before they have a chance to flower and set seed. The goal is to catch them when <br />they are small and to prcVcnt the dcvolopment of a "weed bank" within the gran roc}l-. <br />DISPLACED SOIL- Nesting birds can displace soil- Any displaced snit should unmediat,ely he replaced <br />DRAIN INSPECTION. Roof drains should be inspected every two works and any debris, pebbles, or <br />leaves should be nmoved to keep drains flovuing freely- <br />PES'CCD MOL: (kzasionally pest insects suclt asaphids may show up and bother the plant material, <br />and while not commonplace, fungal problems like miI&V occasionally affect groan roof planfs, lwiost post <br />problems arc the rosult of an imbalaneG in thtr rd Miumbip o f the pest orgauism and its +tatumi blolo$ical <br />controls (beneficial insects Iike ladybugs and lacevwtngs). Many pests and fungal infirmities (like blight or <br />mildew) are usually triggered by unusual weather events that cause the pest to mulliply faster than its <br />bialagaral r antral. In time, the bialo&At control usually catches up and most pest and disea issues tend <br />un be temporary in nature. On the other hand, if persistent past probl uns arc detected, LiveRoo f suggests <br />the use -of organ irM and natural biological contm i agorrts instead of convent ional peStioklm Conventional <br />pesl�cides may mo of inw sensitive auras and mighi also damage roofing membrane;. Consult a <br />professional pricx to applying any biorontrol or pusk or di5e2we fi gbi jug agews- <br />WINTEIR MAINTENANCE: In areas of warm c3imste, the plants will likely be dormant or semi -dormant <br />dining winter, but the weeds will not be. Therclvrc. continuo biweekly -"xne4i walks" and inspeoliuns, and <br />activate or adj ust away watering schcdulc as noedcd for changing weather. <br />DRAINAGE; Since Liv, Roof roquires rib irrigatiotr. existing roof drainage wil l be sufficient per the <br />LiveRoof manufacturer - <br />REV: 01-23-20 PR <br />ATTY/AGR.2020.012/Valera Fooksman (Page 16 of 16) <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.