Laserfiche WebLink
A - Page 17 of 23 <br />21 Elements <br />ADU Questions Round 2 - DRAFT <br />Feb 5, 2020 <br />1. <br />Size........................................................................................................................................................1 <br />2. <br />Special(e)..............................................................................................................................................2 <br />3. <br />Owner Occupancy................................................................................................................................. 2 <br />4. <br />Review/Approval Process..................................................................................................................... 3 <br />5. <br />Number of Units....................................................................................................................................4 <br />6. <br />JADU......................................................................................................................................................4 <br />7. <br />Zoning Standards..................................................................................................................................4 <br />8. <br />150 SF Additions.................................................................................................................................... 6 <br />9. <br />Multifamily Properties..........................................................................................................................6 <br />10. <br />Deed Restrictions..................................................................................................................................7 <br />11. <br />Fire Safety............................................................................................................................................. 7 <br />1. Size <br />Clarify the 50% of floor area for attached ADU versus the required allowable 800 sq ft for an <br />ADU in subsection (e). Also, how do you measure square footage? <br />The most common interpretation is that homeowners can build 800 sf or 50% of the main <br />house, whichever is larger. And that cities can cap the size at 850 (studio/1 bedroom) or 1000 <br />(2+ bedroom) regardless of the size of the main house. <br />The ordinance does not give guidance on how to measure square footage or if garages count. <br />Cities should be consistent with how they measure square footage for other purposes. <br />We're assuming that if combined with a JADU on the lot, you can limit the ADU to 800 SF. Is <br />this correct? Does the 50% include the combined square footage of the ADU and JADU, if <br />someone wants to do both? <br />Currently, if an owner wants to build an ADU and a JADU, the ADU must be in a new <br />freestanding building and the ADU can be limited to 800 sf. Even if the combined area exceeds <br />50 percent of the area of the primary dwelling, the owner is entitled to the 800 sf ADU and a <br />JADU. <br />Similarly, if you have an existing 1,000 SF ADU, you would not be able to add a JADU (because <br />the ADU exceeds 800 SF). Is this correct? <br />That is correct. <br />1 <br />365 <br />