Laserfiche WebLink
EXHIBIT B <br />SHEET 3 OF 4 <br />BIO -RETENTION SOIL CONSIDERATIONS <br />THE BIO—RETENTION PLANTING SOIL SHALL MEET THE REQUIREMENTS SET FORTH IN APPENDIX L OF <br />THE SAN MATED COUNTY CLEANWATER PROGRAM C.3 STORMWATER TECHNICAL GUIDANCE HANDBOOK. <br />BIO—RETENTION SOIL SHALL HAVE A MINIMUM PERCOLATION RATE OF 5' PER HOUR AND MAXIMUM <br />PERCOLATION RATE OF 10' PER HOUR. IF NATIVE SOILS DO NOT MEET THIS PERCOLATION <br />REQUIREMENT, AN ADMIXTURE SHALL BE MIXED INTO PLANTING SOIL TO ALLOW FOR A 5" PER HOUR <br />PERCOLATION RATE. IN—SITU TESTING SHALL BE CONDUCTED TO VERIFY THAT THE MATERIAL MEETS <br />THE PERCOLATION REQUIREMENTS. <br />NO BARK MULCH SHALL BE PLACED IN THE VEGETATED AREA. <br />SHOW PER <br />PER G3 <br />G'EIFIDN NEA OWN N REATYENT <br />BIO -RETENTION AREA <br />TCM #11 <br />(SECTION VIEW) <br />LEA 6 BRAZE ENGINEERING, INC. <br />r—Mdk CIVIL ENGINEERS - LAND SURVEYORS <br />BAY AREA REGION SACRAMENTO REGION <br />2495 INDUSTRIAL PKWY WEST 3017 DOUGLAS BLVD, / 300 <br />HAYWARD, CALIFORNIA 94545 ROSEVILLE, CA 95881 <br />(P) (510) 887-4036 (P) (916)966-1338 <br />(F) (510) 887-3019 (F) (918)797-7383 <br />W W W.LEABR AZE.COM <br />211/217 VERA AVE, <br />REDWOOD CITY <br />SAN MATEO COUNTY <br />JOB NO 2180013 Cl SCALE: 1"= 20' <br />ATTY/AGR.2019.266/211/217 Vera (Page 12 of 38) <br />