My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:28:52 AM
Creation date
2/20/2020 5:56:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/20/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
2/20/2020 5:58 PM
Modified:
2/20/2020 5:58 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 5 of 41 <br />re 3 - Site Area <br />;i[ <br />.Ll <br />The proposed project involves a new mixed-use development that proposes to maintain the same amount <br />of retail and add affordable housing and a significant amount of office space. The ground floor would <br />consist predominantly of retail uses, with housing and office above with Safeway and CVS stores to be <br />retained (Figure 4). While the initial application requested building heights of 7-8 stories along EI Camino <br />Real, two 10 -story buildings, and one 17 -story building along the railroad tracks, the applicant has since <br />withdrawn its request for the 17 -story building and instead would like to comply with the DTPP heights <br />(Figure 5) with the ability to study revised heights on a portion of the site by 1-2 stories given its proximity <br />to the Transit Center (Attachment 3). The project would be served by a large underground garage <br />providing shared parking. <br />A new street grid is proposed connecting Franklin Avenue through the site to James, with cross streets of <br />Hamilton and Harrison, as required by the Downtown Precise Plan. The project includes significant <br />setbacks from the rail right-of-way to facilitate additional tracks, and has a large community gathering and <br />open space between Franklin and the railways. Improved pedestrian and bicycle amenities would be <br />provided along all streets, including EI Camino and James. <br />• Retail of 175,000 sq. ft. - The proposal includes keeping both Safeway and CVS open during <br />construction, and relocating them into new spaces when the first phase of construction is <br />complete. Safeway is the major retailer (and a property owner) in Sequoia Station, and <br />maintaining operations during construction is an important priority. The proposed amount of <br />retail is equal to the existing amount today. <br />Page 5 of 12 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.