My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:28:52 AM
Creation date
2/20/2020 5:56:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 69 of 72 <br />Draft a bike share/emerging mobility Ordinance by summer 2019, and by <br />Delayed; staff has developed a draft Ordinance and, dependent upon <br />December 2019 present for City Council consideration (CDT) <br />other priority items, will be brought before the City Council for <br />consideration in 2020. <br />Complete the Street Car and Transit Center Study by December 2019 (CDT) <br />Complete; the study was presented to City Council in January 2020. <br />Design the Jefferson and Cleveland Intersection Safety Improvement Project <br />In progress; design is 95% complete and project is on schedule to go to <br />by end of 2019 and complete construction by summer 2020 (CDT) <br />construction in the summer. <br />Complete traffic improvements at Jefferson and Middlefield by early 2020 <br />Deferred; due to workload capacity, this initiative has been moved to <br />(CDT) <br />Fiscal Year 2020-21 <br />Advance design of the Whipple Grade Separation project and develop <br />In progress; developed preliminary conceptual alternatives through <br />conceptual grade separation alternatives by early 2020 (CDT) <br />two internal stakeholder meetings. Staff is currently working on <br />materials to conduct an initial community meeting in spring 2020. <br />For the Middlefield Road Improvement project, complete substantive <br />In progress; the utility undergrounding phase was completed in <br />construction of trenches and underground City infrastructure by January <br />January 2020. After the completion of the utility undergrounding, the <br />2020 and complete 50% of the streetscape project by July 2020. Continue <br />next phase will include streetscape improvements beginning in <br />coordinating with private utilities on their undergrounding, which may <br />February 2020. The improvements will include the replacement of <br />continue through 2020 (CDT) <br />sidewalks and the addition of accessible curb ramps, crosswalks, <br />protected bicycle lanes, streetlights, and street trees on Middlefield <br />Road between Maple Street and Woodside Road. <br />Complete Winslow Streets Pedestrian Enhancement Project by April 2020 <br />In progress; design is complete and contractors are preparing for <br />(CDT) <br />construction. <br />Make significant pedestrian and bicycle improvements Downtown, including <br />Deferred; the preferred alternative requires additional funding which <br />the permanent closure of Theatre Way to automobile traffic by spring of <br />is being proposed in the Fiscal Year 2020-21 CIP budget. <br />2020 (CDT) <br />GUIDING PRINCIPLES AND GOALS 22 1 P a g e 304 <br />
The URL can be used to link to this page
Your browser does not support the video tag.