Laserfiche WebLink
Timeline (Estimated) <br />2020 Jan Apr July Oct Dec 2021 Jan Apr July Oct Dec <br />I <br />Grade Separation Study Preferred Afternatives Outreach Prelerred Alternative Outreach 1, Final Plan <br />Caltrain Rail Service Technical Study (Service, Operation, Massing} <br />Station Design Station LocationfDesign Outreach Preferred Atternative Final Plan <br />Transit District(City-led urban Design, Circulation, Street Grid and Land Use) <br />Sequoia Station DeveropmentProject (Pending GPAlreview) (applicant begins studying project - community outreach, formally suhmitapplirations,environmental review) <br />Central Redwood City Visioning - RFP Speaker Series <br />LEGEND: Rail Planning Sequoia '�tion GPAI Land Use Studies <br />e4 J <br />Visio ping (Po p -u ps,Charettes,O nline Surveys, Meetings, etc-) <br />Redwood <br />CityI California <br />Founded1867 <br />