My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:28:52 AM
Creation date
2/20/2020 5:56:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 25 of 50 <br />EXHIBIT EE <br />Redwood City VMSC Concept Design Cost Estimate 1/26/2018 <br />Area Cost/SF I Percent Subtotal <br />rsuiming cosi <br />Building 45,000 SF $700 $31,500,000 <br />Building Total $31,500,000 <br />Site Cost <br />1/2 Parking <br />54,000 SF $25 $1,350,000 <br />1/2 Promenade <br />12,000 SF $45 $540,000 <br />1/2 Park <br />22,500 SF $20 $450,000 <br />Site Total <br />$2,340,000 <br />Building + Site Cost <br />Building & Site Subtotal $33,840,000 <br />Public Art <br />1 % $338,400 <br />Site Design Contengency <br />10 % $3,384,000 <br />Site Construction Contengency <br />10 % $3,384,000 <br />Escalation- .66%/month (8%/yr) <br />30 Months 20 % $6,768,000 <br />Subtotal $47,714,400 <br />Bonds & Insurance 2.3 % $1,097,431 <br />Contractor's Fee & Overhead 4.5 % $2,147,148 <br />TOTAL <br />REV: 06-15-18 VR <br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN <br />C6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.