Laserfiche WebLink
6.D. - Page 45 of 50 <br />11 <br />1 <br />1. <br />1. <br />1 <br />1. <br />L <br />1' <br />1' <br />1'. <br />1' <br />2i <br />2 <br />2. <br />10i <br />10 <br />10. <br />Exhibit C - Fee Matrix <br />REVISED 10.06.2019 <br />Redwood City Phase 1- VMB (BASE FEES - BUILDING, EAST PARKING LOT, PROMENADE) <br />FIRM DISIPLINE PIP <br />ELS Fee Subtotal <br />Consultant Fee Subtotal <br />TOTAL BASE FEES <br />Redwood City Phase 1a- VMB (TRAFFIC CALMING) <br />ELSARCHITECTURE AND URBAN DESIGN <br />Architecture and A/E Team Management <br />(Included above in base fees) <br />ELS ARCHITECTURE AND URBAN DESIGN <br />Architecture and A/E Team Management <br />Edson Design <br />Interior Design + Furnishings <br />Sardis <br />Civil <br />SWA <br />Landscape Architecture <br />Forell Elsesser <br />Structural <br />Integral Group <br />MEP, Fire Protection, Alarm, & LEED <br />Integral Group <br />Solar & Battery Design Build <br />Shalleck Collaborative <br />Shalleck Collaborative <br />Theatre <br />AV <br />Cambridge Seven Associates <br />EOS <br />Natalie Zannechia <br />Cortina Productions <br />Exhibit Designer <br />Exhibit Lighting Design <br />Environemental Graphics <br />Media Piece Production <br />Rights to use of Photos & Image Procurement <br />EOS (Overall Building) <br />Lighting Design <br />Top Flight Specifications <br />Specifications <br />SGH <br />Building Envelope *billing hour)y noY ump sum <br />SGH <br />Building Envelope Commissioning 'billing houriy <br />Muller <br />Kitchen/Food Service <br />Charles M Salter <br />Acoustics *billing hourly not lump sum <br />Charles M Salter <br />Telecommunications *billing houny not lump sum <br />Charles M Salter <br />Security "billing hourly not lump sum <br />Charles M Salter <br />Emergency Responder Radio Communication System <br />Millennium Design <br />Dry Utility/ french Included in CD Fee <br />Unvarsky <br />Fundamental & Enhanced Commissioning <br />Unvarsky <br />Monitoring System Commissioning <br />Healthy Buildings <br />Indoor Air Quality Assessment <br />ELS Fee Subtotal <br />Consultant Fee Subtotal <br />TOTAL BASE FEES <br />Redwood City Phase 1a- VMB (TRAFFIC CALMING) <br />$0 $13,280 $13,280 <br />$209,910 $1,803,540 $2,013,450 <br />$103,096 $773,094 $876,190 <br />$313,006 $2,576,634 $2,889,640 <br />05/30/2019 <br />PERMIT BID <br />PER IT/BID CA <br />.CA <br />$0 $0 $0 <br />$3,000 $10,500 $13,500 <br />$0 $3,000 $3,000 <br />ELS Fee Subtotal $0 <br />Consultant Fee Subtotal $3,000 <br />TOTAL TRAFFIC CALMING FEES -- r r r <br />TOTAL PHASE I Permit/Bid/Construction Administration fees = $316,006 <br />ATTY/AGR.Amend. No.1/ELS Architecture and Urban Design (Page 13 of 18) <br />$0 $0 <br />$13,500 $16,500 <br />rr rr <br />ELSARCHITECTURE AND URBAN DESIGN <br />Architecture and A/E Team Management <br />(Included above in base fees) <br />Sandis <br />Civil <br />SWA <br />Landscape Architecture <br />$0 $13,280 $13,280 <br />$209,910 $1,803,540 $2,013,450 <br />$103,096 $773,094 $876,190 <br />$313,006 $2,576,634 $2,889,640 <br />05/30/2019 <br />PERMIT BID <br />PER IT/BID CA <br />.CA <br />$0 $0 $0 <br />$3,000 $10,500 $13,500 <br />$0 $3,000 $3,000 <br />ELS Fee Subtotal $0 <br />Consultant Fee Subtotal $3,000 <br />TOTAL TRAFFIC CALMING FEES -- r r r <br />TOTAL PHASE I Permit/Bid/Construction Administration fees = $316,006 <br />ATTY/AGR.Amend. No.1/ELS Architecture and Urban Design (Page 13 of 18) <br />$0 $0 <br />$13,500 $16,500 <br />rr rr <br />