|
6.D. - Page 45 of 50
<br />11
<br />1
<br />1.
<br />1.
<br />1
<br />1.
<br />L
<br />1'
<br />1'
<br />1'.
<br />1'
<br />2i
<br />2
<br />2.
<br />10i
<br />10
<br />10.
<br />Exhibit C - Fee Matrix
<br />REVISED 10.06.2019
<br />Redwood City Phase 1- VMB (BASE FEES - BUILDING, EAST PARKING LOT, PROMENADE)
<br />FIRM DISIPLINE PIP
<br />ELS Fee Subtotal
<br />Consultant Fee Subtotal
<br />TOTAL BASE FEES
<br />Redwood City Phase 1a- VMB (TRAFFIC CALMING)
<br />ELSARCHITECTURE AND URBAN DESIGN
<br />Architecture and A/E Team Management
<br />(Included above in base fees)
<br />ELS ARCHITECTURE AND URBAN DESIGN
<br />Architecture and A/E Team Management
<br />Edson Design
<br />Interior Design + Furnishings
<br />Sardis
<br />Civil
<br />SWA
<br />Landscape Architecture
<br />Forell Elsesser
<br />Structural
<br />Integral Group
<br />MEP, Fire Protection, Alarm, & LEED
<br />Integral Group
<br />Solar & Battery Design Build
<br />Shalleck Collaborative
<br />Shalleck Collaborative
<br />Theatre
<br />AV
<br />Cambridge Seven Associates
<br />EOS
<br />Natalie Zannechia
<br />Cortina Productions
<br />Exhibit Designer
<br />Exhibit Lighting Design
<br />Environemental Graphics
<br />Media Piece Production
<br />Rights to use of Photos & Image Procurement
<br />EOS (Overall Building)
<br />Lighting Design
<br />Top Flight Specifications
<br />Specifications
<br />SGH
<br />Building Envelope *billing hour)y noY ump sum
<br />SGH
<br />Building Envelope Commissioning 'billing houriy
<br />Muller
<br />Kitchen/Food Service
<br />Charles M Salter
<br />Acoustics *billing hourly not lump sum
<br />Charles M Salter
<br />Telecommunications *billing houny not lump sum
<br />Charles M Salter
<br />Security "billing hourly not lump sum
<br />Charles M Salter
<br />Emergency Responder Radio Communication System
<br />Millennium Design
<br />Dry Utility/ french Included in CD Fee
<br />Unvarsky
<br />Fundamental & Enhanced Commissioning
<br />Unvarsky
<br />Monitoring System Commissioning
<br />Healthy Buildings
<br />Indoor Air Quality Assessment
<br />ELS Fee Subtotal
<br />Consultant Fee Subtotal
<br />TOTAL BASE FEES
<br />Redwood City Phase 1a- VMB (TRAFFIC CALMING)
<br />$0 $13,280 $13,280
<br />$209,910 $1,803,540 $2,013,450
<br />$103,096 $773,094 $876,190
<br />$313,006 $2,576,634 $2,889,640
<br />05/30/2019
<br />PERMIT BID
<br />PER IT/BID CA
<br />.CA
<br />$0 $0 $0
<br />$3,000 $10,500 $13,500
<br />$0 $3,000 $3,000
<br />ELS Fee Subtotal $0
<br />Consultant Fee Subtotal $3,000
<br />TOTAL TRAFFIC CALMING FEES -- r r r
<br />TOTAL PHASE I Permit/Bid/Construction Administration fees = $316,006
<br />ATTY/AGR.Amend. No.1/ELS Architecture and Urban Design (Page 13 of 18)
<br />$0 $0
<br />$13,500 $16,500
<br />rr rr
<br />ELSARCHITECTURE AND URBAN DESIGN
<br />Architecture and A/E Team Management
<br />(Included above in base fees)
<br />Sandis
<br />Civil
<br />SWA
<br />Landscape Architecture
<br />$0 $13,280 $13,280
<br />$209,910 $1,803,540 $2,013,450
<br />$103,096 $773,094 $876,190
<br />$313,006 $2,576,634 $2,889,640
<br />05/30/2019
<br />PERMIT BID
<br />PER IT/BID CA
<br />.CA
<br />$0 $0 $0
<br />$3,000 $10,500 $13,500
<br />$0 $3,000 $3,000
<br />ELS Fee Subtotal $0
<br />Consultant Fee Subtotal $3,000
<br />TOTAL TRAFFIC CALMING FEES -- r r r
<br />TOTAL PHASE I Permit/Bid/Construction Administration fees = $316,006
<br />ATTY/AGR.Amend. No.1/ELS Architecture and Urban Design (Page 13 of 18)
<br />$0 $0
<br />$13,500 $16,500
<br />rr rr
<br />
|