Laserfiche WebLink
6.D. - Page 90 of 108 <br />353 Main Street <br />Stormwater Treatment Measure Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection <br />and maintenance conducted for the identified stormwater treatment measure(s) subject to <br />the Maintenance Agreement between the City and the property owner during the annual <br />reporting period indicated below. <br />Property Information: <br />Property Address or APN: 353 Main Street Redwood City,CA 94063 <br />Property Owner: 353 Main Street Apartments, LP <br />Contact Information: <br />Nance of person to contact regarding this report: Josh Zimmerman <br />Phone number of contact person: (408) 727-6665 Email. izinimez-man(c�r�,kierwright.com <br />Address to which correspondence regarding this report should be directed: <br />3350 Scott Blvd, 131ft, 22, Santa Clara, CA 95054 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections <br />and maintenance of the identified treatment measures during the time period from <br />to <br />IV. Stormwater Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) arc located <br />on the property identified above and are subject to the Maintenance Agreement: <br />Identifying <br />Number of <br />Treatment <br />Measure <br />Type of Treatment Measure <br />Location of Treatment Measure on the <br />Property <br />1 <br />Bio -Retention. Pond <br />North East side of building, see exhibit <br />2 <br />Flow -Through Planter IA <br />3`d floor of podium deck, see exhibit <br />3 <br />Flow -Through Planter 1B <br />3ed floor of podium deck, see exhibit <br />4 <br />Flow -Through Planter 1C <br />3`d floor of podium deck, see exhibit <br />5 <br />Flow -Through Planter 1D <br />3`d floor of podium deck, see exhibit <br />6 <br />Flow -Through Planter IE <br />3`d floor of podium deck, see exhibit <br />7 <br />Flow -Through Planter lF <br />3`d floor of podium deck, see exhibit <br />Page 1 ow Inspection Report <br />ATTYIAGR.2019.317/Woadside Professional Center, LLC (Page 16 of 29) 228 <br />