My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-03-09 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-03-09 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:25:10 AM
Creation date
3/5/2020 4:04:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 101 of 108 <br />Bioretention Area Maintenance Plan for <br />353 Main Street <br />August 21, 2019 <br />Project Address and Cross Streets: 353 Main Street — Veterans Drive. <br />Assessor's Parcel No.: 052-38-3370 <br />Property Owner: 353 Main Street Apartments, LP Phone No.: 408-984-5600 <br />Designated Contact: Drew Walstrum Phone No.: 408-984-5600 <br />Mailing Address: 1650 Lafayette Street, Santa Clara, CA 95054 <br />The property contains 1 bioretention area(s), located as described below and as shown in <br />the attached site plan'. <br />Bioretention Pond is located North-Eastern corner of property adjacent to the building. <br />E. Routine Maintenance Activities <br />The principal maintenance objective is to prevent sediment buildup and clogging, which <br />reduces pollutant removal efficiency and may lead to bioretention area failure. Routine <br />maintenance activities, and the frequency at which they will be conducted, are shown in <br />Table 1. <br />Table 9 <br />Routine Maintenance Activities for Bioretention Areas <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Remove obstructions, weeds, debris and trash from <br />Quarterly, or as needed after storm <br />bioretention area and its inlets and outlets; and dispose of <br />events <br />properly. <br />2 <br />Inspect bioretention area for standing water. if standing <br />Quarterly, or as needed after storm <br />water does not drain within 2-3 days, till and replace the <br />events <br />surface biotreatment soil with the approved soil mix and <br />replant. <br />3 <br />Check underdrains for clogging. Use the cleanout riser to <br />Quarterly, or as needed after storm <br />clean any clogged underdrains. <br />events <br />4 <br />Maintain the irrigation system and ensure that plants <br />Quarterly <br />are receiving the correct amount of water (if <br />applicable). <br />5 <br />Ensure that the vegetation is healthy and dense <br />Annually, before the wet season <br />enough to provide filtering and protect soils from <br />begins <br />erosion. Prune and weed the bioretention area. <br />Remove andlor replace any dead plants. <br />g <br />Use compost and other natural soil amendments and <br />Annually, before the wet season <br />fertilizers instead of synthetic fertilizers, especially if <br />begins <br />the system uses an underdrain. <br />7 <br />Check that mulch is at appropriate depth (2 - 3 inches per <br />Annually, before the wet season <br />soil specifications) and replenish as necessary before wet <br />begins <br />season begins. It is recommended that 2" — 3" of arbor <br />mulch be reapplied every year. <br />8 <br />Inspect the energy dissipation at the inlet to ensure it is <br />Annually, before the wet season <br />functioning adequately, and that there is no scour of the <br />begins <br />surface mulch. Remove accumulated sediment. <br />Attached site plan must match the site plan exhibit to Maintenance Agreement. <br />Page t <br />ATTYIAGR.2019.31 Mood side Professional Center, LLC (Page 27 of 29) 239 <br />
The URL can be used to link to this page
Your browser does not support the video tag.