My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-04-27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-04-27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 10:04:26 AM
Creation date
4/23/2020 5:54:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/27/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 10 of 57 <br />to the City Engineer and shall guarantee and warrant the Work for a period of <br />one (1) year following the completion and acceptance thereof against any <br />defective work or labor done, or defective materials furnished. <br />14.2 If the improvement security is a corporate surety bond and, in the opinion of the <br />City, any surety or sureties thereon become insufficient, the Developer shall renew or replace any <br />such surety with good and sufficient surety or sureties within ten (10) days after receiving from <br />City written demand thereof. <br />14.3 Improvement security consisting of corporate surety bonds shall be kept on file <br />with the City Engineer. If a corporate surety bond is replaced by another approved bond, the <br />replacement shall be filed with the City Engineer and made a pari of and incorporated into this <br />Agreement. Upon filing and approval by the City Engineer of a replacement bond, the former <br />improvement security shall be released. <br />14.4 Modifications of the Plans and related specifications, and modifications of the <br />Improvements, not exceeding ten percent (10%) of the original Estimated Cost of Work, shall not <br />relieve or release any improvement security furnished by Developer pursuant to this Agreement. <br />If any such modifications exceed ten percent (10%) of the Estimated Cost of Work, Developer <br />shall furnish additional improvement security for, performance, warranty, and payment, as <br />required by Section 14.1 above, for one hundred percent (100%) of the revised Estimated Cost of <br />Work. <br />14.5 The City's approved bond forms are attached hereto as Exhibits C, D and E. <br />15. Partial Reduction or Release of Improvement Security. <br />15.1 Partial releases or reductions in the Developer's improvement security may be <br />authorized prior to the City's acceptance of all Improvements required hereunder, as provided in <br />this Section 15. <br />15.2 Upon acceptance of all or any specified category of the Improvements by the <br />City Council and upon request of the Developer, the improvement security may be reduced or <br />released as follows: <br />(a) Security for Performance: The security for performance shall be released upon <br />the final completion of the Work, the City's acceptance of the Improvements and <br />Developer's delivery of the warranty security described in Section 14.1(c). At the <br />request of Developer, the Director of Public Works may release a portion of the <br />security for performance in conjunction with the acceptance of part of the <br />Improvements; provided, however, that no such release shall be for an amount <br />less than ten percent (10%) of the total security for performance and such <br />security shall not be reduced to an amount less than seventy-five percent (75%) <br />of the total security for performance until final completion and City acceptance <br />of the Improvements. In no event shall the Director of Public Works authorize a <br />release of the security for performance which would reduce such security to an <br />amount below that required to guarantee the completion of the remaining Work <br />and any other obligation imposed under this Agreement. <br />ATTYIAGR12015.1071GREYSTAR -103 WILSON - IA WITH i TIF CREDIT <br />REV: 05-28-15 VR <br />Page 7 of 27 <br />01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.